Difference between revisions of "Polhe3 meeting 20111005"

From Hall A Wiki
Jump to: navigation, search
(New page: * progress ** new cell and oven bottom piece (zhiwen) *** The first cell has not been filled due to some complications in the gas system. The second cell is not delivered and won't be unti...)
 
Line 4: Line 4:
 
** temperature optimization test (all)
 
** temperature optimization test (all)
 
*** redid the water cell calibration,see [http://hallaweb.jlab.org/equipment/targets/polhe3/lab/doc/oct052011.pptx]  ( Jie, Chunhua)
 
*** redid the water cell calibration,see [http://hallaweb.jlab.org/equipment/targets/polhe3/lab/doc/oct052011.pptx]  ( Jie, Chunhua)
*** see Q-curve for new water calibration and lock-in sensitivity test in [http://hallaweb.jlab.org/equipment/targets/polhe3/lab/doc/oct052011.pptx](Chunhua, Jie)
+
*** redid Q-curve for new water calibration and lock-in sensitivity test, see [http://hallaweb.jlab.org/equipment/targets/polhe3/lab/doc/oct052011.pptx](Chunhua, Jie)
 
*** Chunhua is in preparation for temperature optimization test notes (Chunhua)
 
*** Chunhua is in preparation for temperature optimization test notes (Chunhua)
 
  
 
*Calendar
 
*Calendar

Revision as of 15:50, 18 October 2011

  • progress
    • new cell and oven bottom piece (zhiwen)
      • The first cell has not been filled due to some complications in the gas system. The second cell is not delivered and won't be until the first one is filled. Alan is working on oven bottom piece.
    • temperature optimization test (all)
      • redid the water cell calibration,see [1] ( Jie, Chunhua)
      • redid Q-curve for new water calibration and lock-in sensitivity test, see [2](Chunhua, Jie)
      • Chunhua is in preparation for temperature optimization test notes (Chunhua)
  • Calendar
timeline Tasks To be done by status
new cell and oven bottom piece
10/05-10/19 receiving and check fitting all
convection flow study
10/05-10/19 make a zapper coil or a pair of coils to confine field better Chunhua
10/05-10/19 do calibration on old and new RTD. connect RTD readout/control in labview Jie
diffusion mode measurement
10/05-10/19 do the test all
10/05-10/19 improve analysis, check fitting with error estimation and prepare plots for a note. Chunhua
pulse NMR
10/05-10/19 pNMR setup and test Jie
10/05-10/19 find or make coil and test it with capacitor matchbox Chunhua