Difference between revisions of "G2p Safety Readiness Review"
From Hall A Wiki
(→Notes) |
|||
Line 51: | Line 51: | ||
*JLab [http://wwwold.jlab.org/ehs/ehsmanual/3310T2.htm OSP template]. | *JLab [http://wwwold.jlab.org/ehs/ehsmanual/3310T2.htm OSP template]. | ||
*List of previous JLab [https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-1918 OSPs]. | *List of previous JLab [https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-1918 OSPs]. | ||
− | |||
− | |||
− |
Revision as of 22:17, 10 January 2012
January 17, 2012
JLab F113, 1:00-5:00 pm
Topic | Presenter |
---|---|
Welcome and Introduction | J. P. Chen |
Polarized Target | C. Keith |
Hall A Beamline | T. Michalski |
Beamline Commissioning | Y. Roblin |
Engineering, Design & Field Mapping | R. Wines |
Hall A Installation, Mechanical Structures | E. Folts |
Radiation Control | P. Degtiarenko |
Radiation Control | G. Kharashvili |
Experiment Preparation | K. Slifer |
Note to Presenters: Please send your presentation and supporting documents to slifer@jlab.org.
All presentations will then be posted here
All documentation will be posted here
Charge
The official charge.
The committee has also asked us to address these specific questions.
Notes
- Overview of JLab's Operational Safety Procedure Program.
- JLab OSP template.
- List of previous JLab OSPs.