Overview

On January 17, JLab will review the readiness of E08-027/007 to safely begin production data taking. This wikipage is the central repository of all collaboration information relevant to this review. The official charge is here. In addition, the committee has also asked us to address these specific questions.


Review Agenda

January 17, 2012; JLab F113, 1:00-5:00 pm

Topic Presenter
Introduction/Overview (draft) J. P. Chen
Polarized Target update C. Keith
g2p/GEp Beamline (draft) T. Michalski
Beamline (draft) runorbits Y. Roblin
Engineering, Design & Field Mapping R. Wines
Hall A Installation, Mechanical Structures E. Folts
Radiation Control P. Degtiarenko
Radiation Control G. Kharashvili
Experiment Preparation K. Slifer


Individual presentations are posted here (last update 01/10)

Individual documents are posted here (last update 01/11)

Alternatively, all this material can be downloaded as a single archive (last update 01/11)