Line 49: Line 49:
 
==Finalized Documents==
 
==Finalized Documents==
  
[http://hallaweb.jlab.org/experiment/g2p/meetings/safety_011712/docs/final/ENG-11-035-OSP.pdf FZ Magnet/Power Supply OSP]
+
{|border=1
 +
|-bgcolor=Grey
 +
  ! Title
 +
  ! link
 +
|-
 +
  |  Procedure for Maintenance and Operation of Hall A FZ Magnets and FZ Power Supplies
 +
  | [http://hallaweb.jlab.org/experiment/g2p/meetings/safety_011712/docs/final/ENG-11-035-OSP.pdf OSP]
 +
|-
 +
  | Safe Operation of the Big Bite Power Supply
 +
  | [http://hallaweb.jlab.org/experiment/g2p/meetings/safety_011712/docs/final/OSP__BigBite_Power_Supply.pdf OSP]
 +
|}
 +
 
 +
 
  
 
==Notes==
 
==Notes==

Revision as of 12:14, 11 January 2012

Overview

On January 17, JLab will review the readiness of E08-027/007 to safely begin production data taking. This wikipage is the central repository of all collaboration information relevant to this review. The official charge is here. In addition, the committee has also asked us to address these specific questions.


Review Agenda

January 17, 2012; JLab F113, 1:00-5:00 pm

Topic Presenter
Introduction/Overview (draft) J. P. Chen
Polarized Target update C. Keith
g2p/GEp Beamline (draft) T. Michalski
Beamline (draft) runorbits Y. Roblin
Engineering, Design & Field Mapping (draft) R. Wines
Hall A Installation, Mechanical Structures (draft) E. Folts
Radiation Control P. Degtiarenko
Radiation Damage (draft) G. Kharashvili
Experiment Preparation (draft) K. Slifer



Individual documents are posted here (last update 01/11)



Finalized Documents

Title link
Procedure for Maintenance and Operation of Hall A FZ Magnets and FZ Power Supplies OSP
Safe Operation of the Big Bite Power Supply OSP


Notes