Difference between revisions of "G2p Safety Readiness Review"

From Hall A Wiki
Jump to: navigation, search
Line 93: Line 93:
 
|-
 
|-
 
   | Pre Beam Checklist  
 
   | Pre Beam Checklist  
   | [http://hallaweb.jlab.org/experiment/g2p/meetings/safety_011712/docs/draft/Hazard_Awareness.pdf pdf] [http://hallaweb.jlab.org/experiment/g2p/meetings/safety_011712/docs/draft/G2P_pre_beam_checkist_9-21-11.docx docx]
+
   | [http://hallaweb.jlab.org/experiment/g2p/meetings/safety_011712/docs/draft/G2P_pre_beam_checkist_9-21-11.docx docx]
 
|}
 
|}
  

Revision as of 12:34, 11 January 2012

Overview

On January 17, JLab will review the readiness of E08-027/007 to safely begin production data taking. This wikipage is the central repository of all collaboration information relevant to this review. The official charge is here. In addition, the committee has also asked us to address these specific questions.


Review Agenda

January 17, 2012; JLab F113, 1:00-5:00 pm

Topic Presenter
Introduction/Overview (draft) J. P. Chen
Polarized Target update C. Keith
g2p/GEp Beamline (draft) T. Michalski
Beamline (draft) runorbits Y. Roblin
Engineering, Design & Field Mapping (draft) R. Wines
Hall A Installation, Mechanical Structures (draft) E. Folts
Radiation Control P. Degtiarenko
Radiation Damage (draft) G. Kharashvili
Experiment Preparation (draft) K. Slifer



Individual documents are posted here (last update 01/11)



Finalized Documents

Title link
Procedure for Maintenance and Operation of Hall A FZ Magnets and FZ Power Supplies OSP
Safe Operation of the Big Bite Power Supply OSP
Safe Operation of the HKS Power Supply OSP
Septum Magnet Commissioning, Operation, and Troubleshooting OSP
Hall A Slow Raster OSP
Hall A Tungsten Calorimeter Operation OSP

Draft and Supporting Documents

Title link
Conduct of Operations (COO) pdf
Experimental Safety Assesment Document (ESAD) pdf
Polarized Target Primer pdf
Hazard Awareness & Safety Guidelines pdf pdf
Pre Beam Checklist docx


Notes