Difference between revisions of "G2p Safety Readiness Review"
From Hall A Wiki
(→Overview) |
(→Overview) |
||
Line 3: | Line 3: | ||
− | The review | + | The review and the collaboration response are [http://hallaweb.jlab.org/experiment/g2p/meetings/safety_011712/charge/committee_comments.pdf here] (last update 2/8/2012). |
==Review Agenda == | ==Review Agenda == |
Revision as of 17:42, 8 February 2012
Contents
Overview
On January 17, JLab reviewed the readiness of E08-027/007 to safely begin production data taking. This wikipage is the central repository of all collaboration information relevant to this review. The official charge is here. In addition, the committee asked us to address these specific questions.
The review and the collaboration response are here (last update 2/8/2012).
Review Agenda
January 17, 2012; JLab F225, 1:00-5:00 pm
Time | Topic | Presenter |
---|---|---|
1:00 - 1:20 | Introduction/Overview | J. P. Chen |
1:20 - 1:40 | Polarized Target update (short-note) | C. Keith |
1:40 - 2:00 | g2p/GEp Beamline | T. Michalski |
2:00 - 2:20 | Beamline runorbits | Y. Roblin |
2:20 - 3:00 | Break | |
3:00 - 3:20 | Engineering, Design & Field Mapping | R. Wines |
3:20 - 3:40 | Hall A Installation, Mechanical Structures | E. Folts |
3:40 - 4:00 | Radiation Control | P. Degtiarenko |
4:00 - 4:20 | Radiation Damage (updated 1/27/2012) Dose Rates from Local Dump | G. Kharashvili |
4:20 - 4:40 | Experiment Preparation | K. Slifer |
4:40 - 5:00 | Discussion |
Operational Safety Procedures (OSP)
Doc# | Title | link |
---|---|---|
ENG-11-035.OSP | Procedure for ... FZ Magnets and FZ Power Supplies | OSP |
PHY-11-037.OSP | Safe Operation of the Big Bite Power Supply | OSP |
PHY-11-036.OSP | Safe Operation of the HKS Power Supply | OSP |
PHY-11-038.OSP | Septum Magnet Commissioning, Operation, and Troubleshooting | OSP |
PHY-11-046.OSP | Hall A Slow Raster | OSP |
PHY-11-047.OSP | Hall A Tungsten Calorimeter Operation | OSP |
ACC-12-006.OSP | FZ #2 Magnet, Magnet Arms, and Girder Adjustments (in review) | OSP |
PHY-12-008-OSP | Operation of solid polarized target in Hall A (in review) | OSP |
(in review) | G2P 3rd Arm Access | OSP THA |
(in review) | G2P Beam dump insert extraction | OSP THA |
Supporting Documents
Title | link |
---|---|
RSAD : Radiological Safety Analysis Document (in review) | doc |
COO : Conduct of Operations (updated 2/4/12) | |
ESAD : Experimental Safety Assesment Document (updated 2/4/12) | |
Polarized Target Primer | |
Hazard Awareness & Safety Guidelines | pdf pdf |
Pre Beam Checklist | docx |
December Commissioning | TOSP |
Septa Field Mapping | TOSP |
Notes
- Overview of JLab's Operational Safety Procedure Program.
- JLab OSP template.
- List of previous JLab OSPs.
- JLab Docushare