Difference between revisions of "Feb runplan"
(→Task VII: On-line Analysis) |
|||
Line 20: | Line 20: | ||
# Tungsten Calorimeter : Retracted. | # Tungsten Calorimeter : Retracted. | ||
# Polarized Target: Field OFF | # Polarized Target: Field OFF | ||
+ | |||
+ | <U> Beam Diagnostics Check-out</U> ( Pengjia, Alexandre, Kalyan) | ||
+ | # Check BPM, slow and fast raster signals in the data | ||
+ | # Is spot++ working for both arms? | ||
+ | # BPM commissioning plan by Pengjia [http://hallaweb.jlab.org/experiment/g2p/collaborators/kalyan/Beam_Position_Reconstruction_for_g2p.pdf here] | ||
+ | # Check BCM signals in the scalers | ||
+ | |||
+ | |||
== Task II : Moller Commissioning (1 shift) == | == Task II : Moller Commissioning (1 shift) == | ||
Line 44: | Line 52: | ||
Most of these check-out can be done during the initial beamline commissioning(see above) | Most of these check-out can be done during the initial beamline commissioning(see above) | ||
− | |||
− | |||
− | |||
− | |||
<U> HRS Detectors Check-out </U> (Melissa, Ryan, Vince) | <U> HRS Detectors Check-out </U> (Melissa, Ryan, Vince) | ||
Line 67: | Line 71: | ||
## Make sure all important scaler channels are working (BCM, Helicity, triggers, L1A, clock) | ## Make sure all important scaler channels are working (BCM, Helicity, triggers, L1A, clock) | ||
## Check scalers in S1 and S2m detectors for double pulsing | ## Check scalers in S1 and S2m detectors for double pulsing | ||
+ | |||
+ | <U> HRS and Septum Magnet Checks</U> (Min, Jixie?) | ||
+ | |||
+ | # Cycle magnets | ||
+ | # Septum field vs current, checks with carbon elastic peaks | ||
<U> Third Arm Detector Check-out</U> (Chao, Kalyan) | <U> Third Arm Detector Check-out</U> (Chao, Kalyan) | ||
Line 73: | Line 82: | ||
# Check for bad channels, double peaks etc .. | # Check for bad channels, double peaks etc .. | ||
# Check deadtime, helicity, BCM scalers | # Check deadtime, helicity, BCM scalers | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
<U> Helicity Checks</U> (Chao, Pengjia, Kalyan) | <U> Helicity Checks</U> (Chao, Pengjia, Kalyan) | ||
Line 97: | Line 99: | ||
# BCM calibration ? | # BCM calibration ? | ||
# How do we establish that we can achieve ~1% measurement ? | # How do we establish that we can achieve ~1% measurement ? | ||
+ | |||
== Task VI: Optics Commissioning == | == Task VI: Optics Commissioning == | ||
Line 112: | Line 115: | ||
# Post easy instructions for the shift crew on how to start online analysis (stick notes near the DAQ machine) | # Post easy instructions for the shift crew on how to start online analysis (stick notes near the DAQ machine) | ||
# Make sure all the important information is recorded correctly in the datastream: | # Make sure all the important information is recorded correctly in the datastream: | ||
− | ## EPICS: Beam diagnostics(BCM, BPM, | + | ## EPICS: Beam diagnostics(BCM, BPM, HARP etc..) |
## Target variables | ## Target variables | ||
## Helicity sorted scalers information ( triggers, L1A, BCM, helicity etc.) | ## Helicity sorted scalers information ( triggers, L1A, BCM, helicity etc.) |
Revision as of 18:49, 27 February 2012
E08-027/E08-007 Commissioning Runplan (K. Slifer / K. Allada)
Contents
- 1 Task I : Beamline Commissioning (Y. Roblin)
- 2 Task II : Moller Commissioning (1 shift)
- 3 Task III: Compton Test (2 shifts)
- 4 Task IV: HRS/Detector Checkout
- 5 Task V: Tungsten Calorimeter Check-out
- 6 Task VI: Optics Commissioning
- 7 Task VII: On-line Analysis
- 8 Task VIII: Beam Energy Measurement
- 9 Task IX : Polarized Target
Task I : Beamline Commissioning (Y. Roblin)
Initial Beam Accelerator Ops, with assistance from the Hall A shift crew. This includes delivery of beam to the dump, commissioning of the BPMs, calibration with the Harp and power up of the rasters.
Full Details for ONLY straight-through beam delivery are provided at:
Start-up configuration
- Two pass beam, E0 =2.2 GeV, polarized, no raster.
- Current: Initially pulsed up to 2-4<math>\mu</math>A pulsed, then up to 5 <math>\mu</math>A CW.
- Spectrometers at 12.5 degrees, <math>P_0=??</math> MeV (carbon elastic).
- Sieve slits : OUT.
- Septa settings: 5.69 degrees.
- Compton chicane: OFF.
- Polarized Target chicane : OFF and degaussed.
- Tungsten Calorimeter : Retracted.
- Polarized Target: Field OFF
Beam Diagnostics Check-out ( Pengjia, Alexandre, Kalyan)
- Check BPM, slow and fast raster signals in the data
- Is spot++ working for both arms?
- BPM commissioning plan by Pengjia here
- Check BCM signals in the scalers
Task II : Moller Commissioning (1 shift)
(Resp: O. Glamazdin, J. Zhang)
- Detector HV tuning (30min)
- Q1 and Q2 quadruple magnets scan (1hour)
- Moller target longitudinal scan (30 min)
- Beam polarization measurement (30-40min)
- MCC job (to set Moller settings and to restore previous beam parameters) (~2hours)
Total: 5 hours.
Task III: Compton Test (2 shifts)
(Resp: Sirish et al.)
Task IV: HRS/Detector Checkout
(Resp: g2p students)
Most of these check-out can be done during the initial beamline commissioning(see above)
HRS Detectors Check-out (Melissa, Ryan, Vince)
- Check all the detectors in both arm to establish that we don't have problems.
- Post ALL the online plots for the detectors (ADC, TDC etc..) in the Halog
- VDC (efficiencies etc..)
- Gas Cerenkov (ADC and timing peaks)
- S1 and S2m (ADC and timing peaks)
- Lead-glass Calorimeter (ADC)
- Check HV on all the detectors, align the peaks if necessary
DAQ/Trigger Check-out (Melissa, Ryan, Vince)
- Establish the DAQ conditions for production
- What is the max rate DAQ can run with < 20% DT (Buffered and unbuffered mode) ?
- Record deadtime as a function of DAQ rate. Change rate via current or prescalers.
- Check synchronization of ROCs in buffered mode
- Make sure all important scaler channels are working (BCM, Helicity, triggers, L1A, clock)
- Check scalers in S1 and S2m detectors for double pulsing
HRS and Septum Magnet Checks (Min, Jixie?)
- Cycle magnets
- Septum field vs current, checks with carbon elastic peaks
Third Arm Detector Check-out (Chao, Kalyan)
- Set thresholds for 2.2 GeV beam
- Check for bad channels, double peaks etc ..
- Check deadtime, helicity, BCM scalers
Helicity Checks (Chao, Pengjia, Kalyan)
- Larger charge asymmetry runs to check BCM/helicity signals in HAPPEX, HRS, thirdarm, Moller DAQs simultaneously
- Establish that there are no problems by checking Hall-A beam charge asymmetries measured in Hall-C
Lumi Detector Check-out (Pengjia, Kalyan)
- Adjust HV with 100nA current to make sure all channels are roughly aligned and there is no saturation in Happex ADC
- Establish non linearity of the Lumi detectors
- Measure lumi asymmetries
Task V: Tungsten Calorimeter Check-out
(Resp: Alexandre, Pengjia)
- Commission tungsten calorimeter
- BCM calibration ?
- How do we establish that we can achieve ~1% measurement ?
Task VI: Optics Commissioning
(Resp: Jixie, Min, Vince et al.).
Full details are provided at:
Task VII: On-line Analysis
(Resp: Toby)
- Make sure all on-line analysis scripts are up to date on both arms
- Post easy instructions for the shift crew on how to start online analysis (stick notes near the DAQ machine)
- Make sure all the important information is recorded correctly in the datastream:
- EPICS: Beam diagnostics(BCM, BPM, HARP etc..)
- Target variables
- Helicity sorted scalers information ( triggers, L1A, BCM, helicity etc.)
- Helicity in ADC, scaler, TIR
- Start-of-Run and End-of-Run information is up to date with all relevant info
Task VIII: Beam Energy Measurement
(Resp: Vince?)
- Mott ?
Task IX : Polarized Target
(Resp : Target group )
- ??