Difference between revisions of "To do list"

From Hall A Wiki
Jump to: navigation, search
 
 
(3 intermediate revisions by 3 users not shown)
Line 1: Line 1:
*Pion rejector checkout
+
To do list for LEDEX B/Li run February 6th 2007
*Scinitillator
+
 
*VDC
+
 
*EPICS variable in data stream
+
*BCM calibration
 +
**IL02
 +
**beam calorimeter
 +
*BPM calibration , bull eyes scan
 +
*Scaler
 +
*Dead-time
 +
*Detector efficiency
 +
 
 +
*EPICS variable   (done)
 +
*Start/End of run (done)
 +
 
 +
 
 +
*Detectors
 +
** Detector checkout
 +
** Trigger scintillator balancing ( especially S1 right )
 +
** VDC efficiency ( fixed and recovering )
 +
** S1 Left paddle right (fixed)
 +
** Left gas cerenkov ( ok threshold to low during first run )
 +
** check EDTM
 +
** check trigger latch
 +
** check crate synch
 +
 
 +
*Analysis script
 +
**online detector check ( done )
 +
** physics macro
 +
*** dp spectrum
 +
*** beam position raster correction

Latest revision as of 19:41, 7 February 2007

To do list for LEDEX B/Li run February 6th 2007


  • BCM calibration
    • IL02
    • beam calorimeter
  • BPM calibration , bull eyes scan
  • Scaler
  • Dead-time
  • Detector efficiency
  • EPICS variable (done)
  • Start/End of run (done)


  • Detectors
    • Detector checkout
    • Trigger scintillator balancing ( especially S1 right )
    • VDC efficiency ( fixed and recovering )
    • S1 Left paddle right (fixed)
    • Left gas cerenkov ( ok threshold to low during first run )
    • check EDTM
    • check trigger latch
    • check crate synch
  • Analysis script
    • online detector check ( done )
    • physics macro
      • dp spectrum
      • beam position raster correction