Difference between revisions of "Monday, July 10, 2013 11:00 AM - 12:00 PM EDT"

From Hall A Wiki
Jump to: navigation, search
(Removing all content from page)
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
== Call-in information ==
 
  Calling instructions:
 
  Toll-Free Number (U.S.&  Canada):  866-740-1260
 
  International toll number:        303-248-0285
 
  PARTICIPANT CODE:                    2315321#
 
  
 
== Agenda ==
 
 
* Updates on GEANT4 simulations of the detector/lightguide geometry: Peiqing Wang
 
* Discussion of plans for building prototypes: Michael Gericke/Krishna Kumar
 
* Progress on detector cart design: Paul Souder/Krishna Kumar
 
* Further discussion of Mainz beam test issues: Michael Gericke/Krishna Kumar/Frank Maas [https://hallaweb.jlab.org/wiki/index.php/Friday%2C_April_12%2C_2013_11:00am_EST previous teleconference info]
 
 
 
* Update on MOLLER detector simulations: Peiqing Wang [https://userweb.jlab.org/~pqwang/mollerdet_simulation.pdf mollerdet_simulation.pdf] [http://ace.phys.virginia.edu/MollerSpectrometer/216 elog 216] [http://ace.phys.virginia.edu/MollerSpectrometer/217 elog 217] [http://ace.phys.virginia.edu/MollerSpectrometer/218 elog 218]
 
* Update on tracking system status: Mark Pitt for David Armstrong [https://hallaweb.jlab.org/doc-private/ShowDocument?docid=37 DocDB 37][http://www.phys.vt.edu/~pitt/moller_july_2012/pitt_armstrong_tracking_july_2012.pdf pitt_armstrong_tracking_july_2012.pdf]
 
* Brief update on new BCM resolution results and plans: Mark Pitt [https://hallaweb.jlab.org/doc-private/ShowDocument?docid=36 DocDB 36][http://www.phys.vt.edu/~pitt/moller_july_2012/pitt_moller_bcm_jul_26_2012.pdf pitt_moller_bcm_jul_26_2012.pdf]
 
* Suggested topics for August meeting - (update/discussion on integrating mode electronics requirements?, further reports on integration mode detector simulations?, discussion of "optimization" criteria for spectrometer simulations?)
 
 
== Minutes ==
 
 
<br><br> Return to [[Teleconferences]]
 
<br> Return to [[MOLLER at 11 GeV E09-005]]
 

Latest revision as of 16:42, 7 June 2013