'''Run plan with CW beam'''
 
'''Run plan with CW beam'''
 +
 +
* Both HRS at 15 degrees, central momentum P0 = 2.0 GeV/c
  
 
* Establish beam on target using BeO target.  
 
* Establish beam on target using BeO target.  
Line 9: Line 11:
 
*** Move beam positions by 1 or 2 mm?
 
*** Move beam positions by 1 or 2 mm?
 
** Halog BPMs information
 
** Halog BPMs information
 +
  
 
* Spot++ with carbon target
 
* Spot++ with carbon target

Revision as of 13:58, 14 March 2014

Run plan with CW beam

  • Both HRS at 15 degrees, central momentum P0 = 2.0 GeV/c
  • Establish beam on target using BeO target.
    • Move target to BeO
    • Raster off, 5uA current
    • Visual inspection on target camera for spot on BeO target
    • If beam spot not visible
      • Ask max current that can be delivered?
      • Move beam positions by 1 or 2 mm?
    • Halog BPMs information


  • Spot++ with carbon target
    • Move to carbon target
    • Raster 3x3 mm, 5uA
    • Take LHRS and RHRS runs
    • Do spot++ to look for raster size and beam spot
    • Halog plots of BPMs and raster size