Line 1: | Line 1: | ||
'''Run plan with CW beam''' | '''Run plan with CW beam''' | ||
+ | |||
+ | * Both HRS at 15 degrees, central momentum P0 = 2.0 GeV/c | ||
* Establish beam on target using BeO target. | * Establish beam on target using BeO target. | ||
Line 9: | Line 11: | ||
*** Move beam positions by 1 or 2 mm? | *** Move beam positions by 1 or 2 mm? | ||
** Halog BPMs information | ** Halog BPMs information | ||
+ | |||
* Spot++ with carbon target | * Spot++ with carbon target |
Revision as of 13:58, 14 March 2014
Run plan with CW beam
- Both HRS at 15 degrees, central momentum P0 = 2.0 GeV/c
- Establish beam on target using BeO target.
- Move target to BeO
- Raster off, 5uA current
- Visual inspection on target camera for spot on BeO target
- If beam spot not visible
- Ask max current that can be delivered?
- Move beam positions by 1 or 2 mm?
- Halog BPMs information
- Spot++ with carbon target
- Move to carbon target
- Raster 3x3 mm, 5uA
- Take LHRS and RHRS runs
- Do spot++ to look for raster size and beam spot
- Halog plots of BPMs and raster size