Difference between revisions of "HRS checkout"

From Hall A Wiki
Jump to: navigation, search
 
Line 1: Line 1:
 +
HRS checkout plan after beam is estabilshed on the target with BeO target
  
 +
HRS angle 15 degrees, momentum P0 = 2.0 GeV/c, Raster size = 3x3 mm, current = 5uA, target =  Carbon
  
 +
Take Left and Right HRS runs in the following order
 +
*
 +
 +
  
  
 
[[12_GeV_March_2014_running]]
 
[[12_GeV_March_2014_running]]

Revision as of 14:58, 14 March 2014

HRS checkout plan after beam is estabilshed on the target with BeO target

HRS angle 15 degrees, momentum P0 = 2.0 GeV/c, Raster size = 3x3 mm, current = 5uA, target = Carbon

Take Left and Right HRS runs in the following order



12_GeV_March_2014_running