Difference between revisions of "Run plan"
From Hall A Wiki
(22 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
− | + | '''Run plan with CW beam''' | |
− | + | ||
+ | * Both HRS at 15 degrees, central momentum P0 = 2.0 GeV/c | ||
+ | |||
+ | * Establish beam on target using BeO target. | ||
+ | ** Move target to BeO | ||
+ | ** Raster off, 5uA current | ||
+ | ** Visual inspection on target camera for spot on BeO target | ||
+ | ** If beam spot not visible | ||
+ | *** Ask max current that can be delivered? | ||
+ | *** Move beam positions by +/-1 or 2 mm? | ||
+ | ** Halog BPMs information | ||
+ | |||
+ | * Spot++ with carbon target | ||
+ | ** Move to carbon target | ||
+ | ** Raster 3x3 mm, 5uA | ||
+ | ** Take LHRS run with T8 trigger (its a 103.7kHz pulser, so prescale=100) | ||
+ | ** Do spot++ to look for raster size and beam spot | ||
+ | ** Halog plots of BPMs and raster size | ||
+ | |||
+ | |||
+ | [[Raster calibration]] | ||
+ | |||
+ | |||
+ | [[BCM calibration procedure]] | ||
+ | |||
+ | |||
+ | [[Moller commissioning]] | ||
+ | |||
+ | |||
+ | [[HRS checkout]] | ||
+ | |||
+ | |||
+ | [[Wire target runs]] | ||
+ | |||
+ | |||
+ | [[Target boiling studies]] | ||
+ | |||
+ | |||
+ | |||
+ | [[12_GeV_March_2014_running]] |
Latest revision as of 14:57, 16 March 2014
Run plan with CW beam
- Both HRS at 15 degrees, central momentum P0 = 2.0 GeV/c
- Establish beam on target using BeO target.
- Move target to BeO
- Raster off, 5uA current
- Visual inspection on target camera for spot on BeO target
- If beam spot not visible
- Ask max current that can be delivered?
- Move beam positions by +/-1 or 2 mm?
- Halog BPMs information
- Spot++ with carbon target
- Move to carbon target
- Raster 3x3 mm, 5uA
- Take LHRS run with T8 trigger (its a 103.7kHz pulser, so prescale=100)
- Do spot++ to look for raster size and beam spot
- Halog plots of BPMs and raster size