Difference between revisions of "Thursday, April 24, 2014 1:00pm EDT"
From Hall A Wiki
(→Minutes) |
(→Minutes) |
||
(One intermediate revision by the same user not shown) | |||
Line 11: | Line 11: | ||
* Talks | * Talks | ||
− | ** Rakitha - PREX | + | ** Rakitha - PREX background overview |
** Seamus - State of Software | ** Seamus - State of Software | ||
** Seamus - Tracking, collimation | ** Seamus - Tracking, collimation | ||
Line 18: | Line 18: | ||
** Nilanga - GEMs | ** Nilanga - GEMs | ||
** Mark - Beam monitoring | ** Mark - Beam monitoring | ||
+ | ** Kent or Mark - Qweak experience, beam haloing | ||
** Bob - DAQ | ** Bob - DAQ | ||
** Gordon - Source? | ** Gordon - Source? | ||
− | ** Nickie - Background and shielding | + | ** Nickie - Background and shielding simulations, ideas for present design (Tyler's work) |
** Ernie - Engineering | ** Ernie - Engineering | ||
** Javier - Project Managment | ** Javier - Project Managment | ||
** Michael - Detector work | ** Michael - Detector work | ||
** Rupesh - Positioning systematics | ** Rupesh - Positioning systematics | ||
− | ** Dustin - | + | ** Dustin - Showermaxing |
+ | ** Robin - Project integration | ||
+ | ** Accelerator - Coming back up and parity quality beam? | ||
+ | |||
<br><br> Return to [[Teleconferences]] | <br><br> Return to [[Teleconferences]] | ||
<br> Return to [[MOLLER at 11 GeV E09-005]] | <br> Return to [[MOLLER at 11 GeV E09-005]] |
Latest revision as of 13:58, 24 April 2014
Previous meeting: Thursday, April 17, 2014 1:00pm EDT
Agenda
- Background radiation simulations - review geometry such as lead placement
- Collaboration meeting talks
- Nickie [1]
- Rakitha [2]
Minutes
- Talks
- Rakitha - PREX background overview
- Seamus - State of Software
- Seamus - Tracking, collimation
- Juliette - Spectrometer
- Kent - Polarimetry
- Nilanga - GEMs
- Mark - Beam monitoring
- Kent or Mark - Qweak experience, beam haloing
- Bob - DAQ
- Gordon - Source?
- Nickie - Background and shielding simulations, ideas for present design (Tyler's work)
- Ernie - Engineering
- Javier - Project Managment
- Michael - Detector work
- Rupesh - Positioning systematics
- Dustin - Showermaxing
- Robin - Project integration
- Accelerator - Coming back up and parity quality beam?
Return to Teleconferences
Return to MOLLER at 11 GeV E09-005