Difference between revisions of "MOLLER Detector"
From Hall A Wiki
(→Phone Conference: Detector prototype test with beam in Mainz for 2014 (April 08, 2014 at 10:30 am EST):) |
(→Phone Conference Regarding Detector Prototype Test with Beam in Mainz for 2014) |
||
Line 15: | Line 15: | ||
===Phone Conference Regarding Detector Prototype Test with Beam in Mainz for 2014=== | ===Phone Conference Regarding Detector Prototype Test with Beam in Mainz for 2014=== | ||
− | # [[May 06, 2014 at 10:30 am EST]] | + | # [[(May 06, 2014 at 10:30 am EST)]] |
# [[April 08, 2014 at 10:30 am EST]] | # [[April 08, 2014 at 10:30 am EST]] | ||
Revision as of 12:07, 10 May 2014
Contents
- 1 Integrating Detector Development Work
- 1.1 General Comments (Please sign and order by most recent first)
- 1.2 Phone Meetings
- 1.2.1 Phone Conference Regarding Detector Prototype Test with Beam in Mainz for 2014
- 1.2.2 Phone Conference: Detector prototype test with beam in Mainz for 2014 (April 08, 2014 at 10:30 am EST):
- 1.2.3 Phone Conference: Detector prototype test with beam in Mainz for 2014 (March 25, 2014 at 9:30 am EST):
- 1.3 File Links (DocDB, E-Log, etc.)
Integrating Detector Development Work
General Comments (Please sign and order by most recent first)
Another beam test in Mainz is scheduled for November 28 7:00 am through December 1 7:00 am, 2014 --Mgericke 15:41, 10 May 2014 (UTC)
We have had many meetings for detector development and much work that has been done and documented in other places (e-logs, etc...). From now on, as we have meetings, we should put the presented material here, either directly or linked from other places, such as the elog. --Mgericke 15:35, 22 March 2014 (UTC)
Phone Meetings
Phone Conference Regarding Detector Prototype Test with Beam in Mainz for 2014
Phone Conference: Detector prototype test with beam in Mainz for 2014 (April 08, 2014 at 10:30 am EST):
Phone Conference: Detector prototype test with beam in Mainz for 2014 (March 25, 2014 at 9:30 am EST):
- Presentations
File Links (DocDB, E-Log, etc.)
General Presentations
- DocDB Files
- Shower Max Detector Plans for MOLLER, Dustin McNulty (Collab. Meet. May 2014)
- Detector Mounting Conceptual Design, Paul Souder (Collab. Meet. May 2014)
- Integrating Detector Project Overview, Michael Gericke (Collab. Meet. May 2014)
- Integrating Detectors Overview, Michael Gericke (Collab. Meet. October 2013)
- Manitoba Prototype Beam Test Results, Peiqing Wang (Collab. Meet. October 2013)
Detailed Presentations with regard to prototype test results with beam in Mainz:
- DocDB Files
- E-log Entries
Detector development leading up to the first prototype test with beam in Mainz:
Below is a (very likely incomplete) list of presentations that have been made in the past, linked from various e-logs. --Mgericke 17:01, 22 March 2014 (UTC)
- DocDB Files
- First Look of Moller Integrating Detectors in the Full Simulation Environment, Peiqing Wang (January 2013)
- Background and Crosstalk Studies for the Moller Detectors, Peiqing Wang (March 2013)
- Detector prototype tests at Mainz, Peiqing Wang (April 2013)
- Moller Main Detector Simulation and Prototype, Peiqing Wang (June 2013)
- Detector Simulations and Prototype, Peiqing Wang (June 2013)
- Integrating Detector Overview, Michael Gericke (June 2013)
- Detector Assembly, Paul Souder (June 2013)
- Hydro Moller and Beam Tests, Frank Mass (June 2013)
- Moller Detector Simulation Update, Peiqing Wang (November 2012)
- Moller Detector Optimization, Peiqing Wang (September 2012)
- Moller Detector Simulation, Peiqing Wang (September 2012)
- Plans for Integrating Detectors and Electronics, Michael Gericke (September 2012)
- Moller Detector Simulation, Peiqing Wang (August 2012)
- MOLLER CAD: Focus on Detectors, Krishna Kumar (April 2011)
- Integrating Detector Considerations (Brainstorming,) Michael Gericke (Nov. 2010)