Difference between revisions of "Run Plan (DVCS3)"

From Hall A Wiki
Jump to: navigation, search
(BPMs)
(BPMs)
Line 10: Line 10:
 
==== BPMs====
 
==== BPMs====
 
Use the procedure that is under .....
 
Use the procedure that is under .....
Need: To insure that minimal beam lost in the machine can be measured, beam that would go up to about 100 uA. We also need to be the only hall receiving beam.
+
Need: To insure that minimal beam lost in the machine can be measured, beam that would go up to about 100 uA. We also need to be the only hall receiving beam.&b;
 
Open question: Do we want to calibrate against the Unser monitor?
 
Open question: Do we want to calibrate against the Unser monitor?
  

Revision as of 09:40, 10 September 2014

Assume: -longitudinally polarized beam -max 20 uA but for short times when it can go higher -7.7 GeV-4 pass or beam


Commissioning/ Calibration

Beam instruments

BCM

BPMs

Use the procedure that is under ..... Need: To insure that minimal beam lost in the machine can be measured, beam that would go up to about 100 uA. We also need to be the only hall receiving beam.&b; Open question: Do we want to calibrate against the Unser monitor?

Moeller

The proposal goal calls for ΔP/P=1%. Open questions: How often do we want to measure the polarization?

Compton

Luminosity

Target Boiling

Deadtime check

HRS

Measure efficiencies S2m, Cerenkov and wire chamber

Calorimeter

DC readings

Elastic Calibration

Main DVCS kinematics

12 GeV Era Run Schedule

more of that

12 GeV Era Run Schedule

and even more