Difference between revisions of "Saturday, November 8: OWL Shift"

From Hall A Wiki
Jump to: navigation, search
Line 3: Line 3:
 
** Follow the generic [https://hallaweb.jlab.org/wiki/index.php/Instructions_for_shift_takers Instruction for shift takers]
 
** Follow the generic [https://hallaweb.jlab.org/wiki/index.php/Instructions_for_shift_takers Instruction for shift takers]
 
** In general, technical staff should not be contacted by the shift crew - please call the RC first.
 
** In general, technical staff should not be contacted by the shift crew - please call the RC first.
 +
** If the run plan calls for some significant period of beam at 10 uA or greater please call Mahmoud Ahmad, who would like to perform a parasitic beam diagnostic test (no impact to us). His contact information will be written on the white board in the Counting House.
  
 
* Instructions for this shift
 
* Instructions for this shift
Line 8: Line 9:
 
** First tasks with beam will be checking out the beamline elements (BPMs, raster, etc).
 
** First tasks with beam will be checking out the beamline elements (BPMs, raster, etc).
 
*** Ask MCC to center the beam as best they can using Hall A dump ion chambers.
 
*** Ask MCC to center the beam as best they can using Hall A dump ion chambers.
*** Follow steps 1-3 of the "Beamline" run plan [https://hallaweb.jlab.org/wiki/index.php/Beamline here].
+
*** Follow steps 1-3 of the "Beamline" run plan [https://hallaweb.jlab.org/wiki/index.php/Beamline here]. Important: if the raster is not functioning as expected immediately halt the program and contact the run coordinator.
 +
*** Perform a rough BCM calibration up to 20 uA. Detailed procedure, TBD.
 +
 
 +
** If time remains, start spectrometer checkout.

Revision as of 12:19, 7 November 2014

  • General considerations
    • We do not yet have an RC phone. Dave Gaskell is the current Run Coordinator. Please contact me directly via the JLab paging utility: [1]
    • Follow the generic Instruction for shift takers
    • In general, technical staff should not be contacted by the shift crew - please call the RC first.
    • If the run plan calls for some significant period of beam at 10 uA or greater please call Mahmoud Ahmad, who would like to perform a parasitic beam diagnostic test (no impact to us). His contact information will be written on the white board in the Counting House.
  • Instructions for this shift
    • MCC will be working on setting up beam to Hall A. Wait until their work is complete and they tell you they are ready to hand over beam to the hall.
    • First tasks with beam will be checking out the beamline elements (BPMs, raster, etc).
      • Ask MCC to center the beam as best they can using Hall A dump ion chambers.
      • Follow steps 1-3 of the "Beamline" run plan here. Important: if the raster is not functioning as expected immediately halt the program and contact the run coordinator.
      • Perform a rough BCM calibration up to 20 uA. Detailed procedure, TBD.
    • If time remains, start spectrometer checkout.