Difference between revisions of "Saturday, November 8: OWL Shift"

From Hall A Wiki
Jump to: navigation, search
 
(4 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
* General considerations
 
* General considerations
 
** We do not yet have an RC phone. Dave Gaskell is the current Run Coordinator. Please contact me directly via the JLab paging utility: [https://misportal.jlab.org/mis/staff/staffsearch.cfm]
 
** We do not yet have an RC phone. Dave Gaskell is the current Run Coordinator. Please contact me directly via the JLab paging utility: [https://misportal.jlab.org/mis/staff/staffsearch.cfm]
** Follow the generic [https://hallaweb.jlab.org/wiki/index.php/Instructions_for_shift_takers Instruction for shift takers]
+
** Follow the generic [https://hallaweb.jlab.org/wiki/index.php/Instructions_for_shift_takers Instructions for shift takers]
 
** In general, technical staff should not be contacted by the shift crew - please call the RC first.
 
** In general, technical staff should not be contacted by the shift crew - please call the RC first.
 
** If the run plan calls for some significant period of beam at 10 uA or greater please call Mahmoud Ahmad, who would like to perform a parasitic beam diagnostic test (no impact to us). His contact information will be written on the white board in the Counting House.
 
** If the run plan calls for some significant period of beam at 10 uA or greater please call Mahmoud Ahmad, who would like to perform a parasitic beam diagnostic test (no impact to us). His contact information will be written on the white board in the Counting House.
  
 
* Instructions for this shift
 
* Instructions for this shift
 +
*** Note that Jessie Butler will arrive at 8 am to work on the left HRS vacuum. Call MCC at 7:30 and tell them you would like to make a Controlled Access. If MCC is in the middle of beam setup - they may ask to delay. If so - please call me (the RC) so that I can let Jessie know.
 
** MCC will be working on setting up beam to Hall A. Wait until their work is complete and they tell you they are ready to hand over beam to the hall.
 
** MCC will be working on setting up beam to Hall A. Wait until their work is complete and they tell you they are ready to hand over beam to the hall.
 
** In preparation for first beam, make sure the VDC HV is off
 
** In preparation for first beam, make sure the VDC HV is off
Line 11: Line 12:
 
** First tasks with beam will be checking out the beamline elements (BPMs, raster, etc).
 
** First tasks with beam will be checking out the beamline elements (BPMs, raster, etc).
 
*** Ask MCC to center the beam as best they can using Hall A dump ion chambers.
 
*** Ask MCC to center the beam as best they can using Hall A dump ion chambers.
*** Follow steps 1-3 of the "Beamline" run plan [https://hallaweb.jlab.org/wiki/index.php/Beamline here]. Important: if the raster is not functioning as expected immediately halt the program and contact the run coordinator.
+
*** Follow steps 1-3 of the "Beamline" run plan [https://hallaweb.jlab.org/wiki/index.php/Beamline here]. Note that we will NOT be going through the COmpton chicane. Important: if the raster is not functioning as expected immediately halt the program and contact the run coordinator.
*** Perform a rough BCM calibration up to 20 uA. This calibration will use the Unser only - not the Faraday cup. First, start a CODA run. Ask MCC to send beam in at the following currents: 0-5-0-10-0-15-0-20-0-15-10-0-5-0. Spend two minutes at each current. While
+
*** Perform a rough BCM calibration up to 20 uA. This calibration will use the Unser only - not the Faraday cup. First, start a CODA run. Ask MCC to send beam in at the following currents: 0-5-0-10-0-15-0-20-0-15-10-0-5-0. Spend two minutes at each current.
  
** If time remains, start spectrometer checkout and begin looking for HRS-calorimeter coincidences. For this part of the plan - contact Carlos (contact info on the white board).
+
** If time remains, start spectrometer checkout and begin looking for HRS-calorimeter coincidences. For this part of the plan - contact Carlos (contact info on the white board). The calorimeter HV will need to be turned on and put in the correct position - this will be done by Carlos or his assigned substitute.
 +
**Kinematics, DVCS Kin1: Ebeam = 7.3 GeV, PLHRS=2.71 GeV  Theta_HRS=22.83 Theta_calo=12.35

Latest revision as of 19:00, 7 November 2014

  • General considerations
    • We do not yet have an RC phone. Dave Gaskell is the current Run Coordinator. Please contact me directly via the JLab paging utility: [1]
    • Follow the generic Instructions for shift takers
    • In general, technical staff should not be contacted by the shift crew - please call the RC first.
    • If the run plan calls for some significant period of beam at 10 uA or greater please call Mahmoud Ahmad, who would like to perform a parasitic beam diagnostic test (no impact to us). His contact information will be written on the white board in the Counting House.
  • Instructions for this shift
      • Note that Jessie Butler will arrive at 8 am to work on the left HRS vacuum. Call MCC at 7:30 and tell them you would like to make a Controlled Access. If MCC is in the middle of beam setup - they may ask to delay. If so - please call me (the RC) so that I can let Jessie know.
    • MCC will be working on setting up beam to Hall A. Wait until their work is complete and they tell you they are ready to hand over beam to the hall.
    • In preparation for first beam, make sure the VDC HV is off
    • When beam arrives, call Alexandre Camsonne (contact info on white board).
    • First tasks with beam will be checking out the beamline elements (BPMs, raster, etc).
      • Ask MCC to center the beam as best they can using Hall A dump ion chambers.
      • Follow steps 1-3 of the "Beamline" run plan here. Note that we will NOT be going through the COmpton chicane. Important: if the raster is not functioning as expected immediately halt the program and contact the run coordinator.
      • Perform a rough BCM calibration up to 20 uA. This calibration will use the Unser only - not the Faraday cup. First, start a CODA run. Ask MCC to send beam in at the following currents: 0-5-0-10-0-15-0-20-0-15-10-0-5-0. Spend two minutes at each current.
    • If time remains, start spectrometer checkout and begin looking for HRS-calorimeter coincidences. For this part of the plan - contact Carlos (contact info on the white board). The calorimeter HV will need to be turned on and put in the correct position - this will be done by Carlos or his assigned substitute.
    • Kinematics, DVCS Kin1: Ebeam = 7.3 GeV, PLHRS=2.71 GeV Theta_HRS=22.83 Theta_calo=12.35