Difference between revisions of "Sunday, November 9: OWL Shift"
From Hall A Wiki
(New page: * General considerations ** We do not yet have an RC phone. Dave Gaskell is the current Run Coordinator. Please contact me directly via the JLab paging utility: [https://misportal.jlab.org...) |
|||
Line 6: | Line 6: | ||
* Instructions for this shift | * Instructions for this shift | ||
− | |||
** Continue LHRS-Calorimeter coincdence running on carbon. Beam current TBD. | ** Continue LHRS-Calorimeter coincdence running on carbon. Beam current TBD. | ||
** Kinematics, DVCS Kin1: Ebeam = 7.3 GeV, PLHRS=2.71 GeV Theta_HRS=22.83 Theta_calo=12.35 | ** Kinematics, DVCS Kin1: Ebeam = 7.3 GeV, PLHRS=2.71 GeV Theta_HRS=22.83 Theta_calo=12.35 | ||
** Make sure to use the DVCS configuration for all runs. | ** Make sure to use the DVCS configuration for all runs. |
Revision as of 11:22, 8 November 2014
- General considerations
- We do not yet have an RC phone. Dave Gaskell is the current Run Coordinator. Please contact me directly via the JLab paging utility: [1]
- Follow the generic Instructions for shift takers
- In general, technical staff should not be contacted by the shift crew - please call the RC first.
- If the run plan calls for some significant period of beam at 10 uA or greater please call Mahmoud Ahmad, who would like to perform a parasitic beam diagnostic test (no impact to us). His contact information will be written on the white board in the Counting House.
- Instructions for this shift
- Continue LHRS-Calorimeter coincdence running on carbon. Beam current TBD.
- Kinematics, DVCS Kin1: Ebeam = 7.3 GeV, PLHRS=2.71 GeV Theta_HRS=22.83 Theta_calo=12.35
- Make sure to use the DVCS configuration for all runs.