(New page: Go back to Daily Run Plan Daily Run Plans * General considerations ** Kijun Park is the current Run Coordinator. Please contact directly via RC phone 757-876-1787 ** Follow the generic...)
 
 
(One intermediate revision by the same user not shown)
Line 11: Line 11:
 
* Instructions for this shift
 
* Instructions for this shift
 
** Beam Study (08-20), Controlled Access
 
** Beam Study (08-20), Controlled Access
 +
** change LHRS angle = 33.4 (deg), p<sub>0</sub>=3.2GeV/c

Latest revision as of 13:14, 16 December 2014

Go back to Daily Run Plan Daily Run Plans

  • General considerations
    • Kijun Park is the current Run Coordinator. Please contact directly via RC phone 757-876-1787
    • Follow the generic Instructions for shift takers
    • Shift leaders: Please make sure to fill out the beam time accounting form and write a "Shift Summary" log entry at the end of your shift regardless if there is beam or not.
    • In general, Hall technical staff should not be contacted by the shift crew - please call the RC first.
    • The target operator is required to supervise the cryo-target.
    • Make sure to use the DVCS CODA configuration for all runs (even when taking single arm HRS data).
    • Note that ion chamber calibrations have ALREADY been done for: carbon (single foil), carbon (five-foil), LH2, and BeO. See this log entry for the first three and this log entry for BeO. The limits on the ion chambers for these targets were set up for currents up to 20 uA.