(New page: Go back to Daily Run Plan Daily Run Plans * General considerations ** Nickie Hirlinger Saylor is the current Run Coordinator. Please contact directly via RC phone 757-876-1787 ** Follo...)
 
 
(2 intermediate revisions by the same user not shown)
Line 7: Line 7:
 
** The target operator is required to supervise the cryo-target.
 
** The target operator is required to supervise the cryo-target.
 
** Make sure to use the <b>DVCS CODA configuration</b> for all runs (<b>even when taking single arm HRS data</b>).
 
** Make sure to use the <b>DVCS CODA configuration</b> for all runs (<b>even when taking single arm HRS data</b>).
** Note that ion chamber calibrations have ALREADY been done for: carbon (single foil), carbon (five-foil), LH2, and BeO. See [https://logbooks.jlab.org/entry/3311606 this log entry] for the first three and [https://logbooks.jlab.org/entry/3311716 this log entry for BeO]. The limits on the ion chambers for these targets were set up for currents up to 20 uA.
 
  
  
Line 13: Line 12:
 
** Wait for beam, then call RC.
 
** Wait for beam, then call RC.
 
** Prepare to do beam line run plan:
 
** Prepare to do beam line run plan:
 +
** [https://hallaweb.jlab.org/wiki/index.php/Beamline Beamline run plan.]
 
*** BeO
 
*** BeO
 
*** Carbon Hole
 
*** Carbon Hole
 
*** Bullseye Scan / Harp (bpm pedestal)
 
*** Bullseye Scan / Harp (bpm pedestal)

Latest revision as of 06:09, 6 March 2015

Go back to Daily Run Plan Daily Run Plans

  • General considerations
    • Nickie Hirlinger Saylor is the current Run Coordinator. Please contact directly via RC phone 757-876-1787
    • Follow the generic Instructions for shift takers
    • Shift leaders: Please make sure to fill out the beam time accounting form and write a "Shift Summary" log entry at the end of your shift regardless if there is beam or not.
    • In general, Hall technical staff should not be contacted by the shift crew - please call the RC first.
    • The target operator is required to supervise the cryo-target.
    • Make sure to use the DVCS CODA configuration for all runs (even when taking single arm HRS data).


  • Instructions for this shift
    • Wait for beam, then call RC.
    • Prepare to do beam line run plan:
    • Beamline run plan.
      • BeO
      • Carbon Hole
      • Bullseye Scan / Harp (bpm pedestal)