Difference between revisions of "Tuesday, March 23: OWL Shift"
From Hall A Wiki
m |
|||
Line 22: | Line 22: | ||
*** 4. Assuming 20uA beam current, take 5 min (or ~100k events) run for each of these Q1 currents: | *** 4. Assuming 20uA beam current, take 5 min (or ~100k events) run for each of these Q1 currents: | ||
** Q1 current: | ** Q1 current: | ||
− | *** | + | *** 192 A |
*** 202 A | *** 202 A | ||
− | *** | + | *** 223 A |
− | *** | + | *** 234 A |
** 5. Move to LH2 target to continue DVCS runs | ** 5. Move to LH2 target to continue DVCS runs | ||
− | ** 6. Change R-HRS P0 = 1.896 GeV (need to cycle Q2/Q3) | + | ** 6. Change R-HRS P0 = 1.896 GeV (need to cycle Q2/Q3) - (turn off regulator for Q2/Q3, set I =1600A. turn on regulator) |
** 7. Set Q1 current to 403.8 A | ** 7. Set Q1 current to 403.8 A | ||
** 8. When D1 is ready start R-HRS runs. | ** 8. When D1 is ready start R-HRS runs. |
Revision as of 23:13, 23 March 2015
Go back to Daily Run Plan Daily Run Plans
- General considerations
- Brad Sawatzky is the current Run Coordinator. Please contact directly via RC phone 757-876-1787
- Follow the generic Instructions for shift takers
- Shift leaders: Please make sure to fill out the beam time accounting form and write a "Shift Summary" log entry at the end of your shift regardless if there is beam or not.
- In general, Hall technical staff should not be contacted by the shift crew - please call the RC first.
- The target operator is required to supervise the cryo-target.
- Make sure to use the DVCS CODA configuration for all runs (even when taking single arm HRS data).
- Instructions for this shift
- 1) When beam first arrives to the Hall
- - Ask MCC to run the Harps: 1C18A/B and 1C04A/B
- - halog the results
- 2) Confirm the beam position using the carbon hole target.
- 3) Run the right arm optic scan described here:
- Here is the run plan for the R-HRS Q1 tune. This can be done before
- moving to LH2 target for DVCS running.
- 1. Move target to Optics
- 2. Set P0= 1.0 GeV/c, Q1 current = 192 A
- 3. Set R-HRS prescale ps1=1, others=0 (should be already set, but check)
- 4. Assuming 20uA beam current, take 5 min (or ~100k events) run for each of these Q1 currents:
- Q1 current:
- 192 A
- 202 A
- 223 A
- 234 A
- 5. Move to LH2 target to continue DVCS runs
- 6. Change R-HRS P0 = 1.896 GeV (need to cycle Q2/Q3) - (turn off regulator for Q2/Q3, set I =1600A. turn on regulator)
- 7. Set Q1 current to 403.8 A
- 8. When D1 is ready start R-HRS runs.
- 9. halog all the run numbers with Q1 current
- 1) When beam first arrives to the Hall