Difference between revisions of "Tuesday, March 23: OWL Shift"

From Hall A Wiki
Jump to: navigation, search
Line 10: Line 10:
  
 
* Instructions for this shift
 
* Instructions for this shift
 +
** 0) Check the beam position
 +
*** - request beam position: BPM A=(+2.5:-0.5), BPM B=(+2.5:+0.5)
 
** 1) When beam first arrives to the Hall
 
** 1) When beam first arrives to the Hall
 
***  - Ask MCC to run the Harps: 1C18A/B and 1C04A/B
 
***  - Ask MCC to run the Harps: 1C18A/B and 1C04A/B
 
***  - halog the results
 
***  - halog the results
** 2) Confirm the beam position using the carbon hole target.
+
** 2) Confirm the beam position using the carbon hole target.  
** 3) Run the right arm optic scan described here:
+
*** - request CW 5uA without raster
 +
*** - check the scaler rate rastered target up to 2x2
 +
** 3) Run the right arm optic scan described here: (at the same time, take single DVCS run)
 
***  Here is the run plan for the R-HRS Q1 tune. This can be done before moving to LH2 target for DVCS running.
 
***  Here is the run plan for the R-HRS Q1 tune. This can be done before moving to LH2 target for DVCS running.
 
***  1. Move target to Optics
 
***  1. Move target to Optics
Line 30: Line 34:
 
**  8. When D1 is ready start R-HRS runs.
 
**  8. When D1 is ready start R-HRS runs.
 
**  9. halog all the run numbers with Q1 current
 
**  9. halog all the run numbers with Q1 current
 +
 +
** Turn on DVCS HV
  
 
***[https://hallaweb.jlab.org/wiki/index.php/Beamline Beamline commissioning how-to.]
 
***[https://hallaweb.jlab.org/wiki/index.php/Beamline Beamline commissioning how-to.]

Revision as of 05:17, 24 March 2015

Go back to Daily Run Plan Daily Run Plans

  • General considerations
    • Brad Sawatzky is the current Run Coordinator. Please contact directly via RC phone 757-876-1787
    • Follow the generic Instructions for shift takers
    • Shift leaders: Please make sure to fill out the beam time accounting form and write a "Shift Summary" log entry at the end of your shift regardless if there is beam or not.
    • In general, Hall technical staff should not be contacted by the shift crew - please call the RC first.
    • The target operator is required to supervise the cryo-target.
    • Make sure to use the DVCS CODA configuration for all runs (even when taking single arm HRS data).


  • Instructions for this shift
    • 0) Check the beam position
      • - request beam position: BPM A=(+2.5:-0.5), BPM B=(+2.5:+0.5)
    • 1) When beam first arrives to the Hall
      • - Ask MCC to run the Harps: 1C18A/B and 1C04A/B
      • - halog the results
    • 2) Confirm the beam position using the carbon hole target.
      • - request CW 5uA without raster
      • - check the scaler rate rastered target up to 2x2
    • 3) Run the right arm optic scan described here: (at the same time, take single DVCS run)
      • Here is the run plan for the R-HRS Q1 tune. This can be done before moving to LH2 target for DVCS running.
      • 1. Move target to Optics
      • 2. Set P0= 1.0 GeV/c, Q1 current = 192 A
      • 3. Set R-HRS prescale ps1=1, others=0 (should be already set, but check)
      • 4. Assuming 20uA beam current, take 5 min (or ~100k events) run for each of these Q1 currents:
    • Q1 current:
      • 192 A
      • 202 A
      • 223 A
      • 234 A
    • 5. Move to LH2 target to continue DVCS runs
    • 6. Change R-HRS P0 = 1.896 GeV (need to cycle Q2/Q3) - (turn off regulator for Q2/Q3, set I =1600A. turn on regulator)
    • 7. Set Q1 current to 403.8 A
    • 8. When D1 is ready start R-HRS runs.
    • 9. halog all the run numbers with Q1 current
    • Turn on DVCS HV