Difference between revisions of "Wednesday, April 29: SWING Shift"
From Hall A Wiki
(New page: Go back to Daily Run Plan Daily Run Plans * General considerations ** Luke Myers is the current Run Coordinator. Please contact directly via RC phone 757-876-1787 ** Follow the generic...) |
|||
(2 intermediate revisions by the same user not shown) | |||
Line 11: | Line 11: | ||
** Note: Keep an eye on the white board in CC more detail | ** Note: Keep an eye on the white board in CC more detail | ||
− | * | + | * Detailed instructions [https://hallaweb.jlab.org/wiki/index.php/Spectrometer_Optics_2pass_48d#Delta_Scan_with_Proton_Elastic here] |
− | + | ||
− | + | <b>Harp Check</b> | |
− | * | + | |
− | + | * Ask MCC to run the four harps in the ARC (these are named 1C07A, 1C07B and 1C18A, 1C18B) | |
− | + | ** Current should be limited to 5 uA for this test | |
− | ** | + | * Make sure that each harp scan shows three clear peaks |
− | + | ||
− | + | ||
− | * | + | |
***[https://hallaweb.jlab.org/wiki/index.php/Beamline Beamline commissioning how-to.] | ***[https://hallaweb.jlab.org/wiki/index.php/Beamline Beamline commissioning how-to.] |
Latest revision as of 15:39, 29 April 2015
Go back to Daily Run Plan Daily Run Plans
- General considerations
- Luke Myers is the current Run Coordinator. Please contact directly via RC phone 757-876-1787
- Follow the generic Instructions for shift takers
- Shift leaders: Please make sure to fill out the beam time accounting form and write a "Shift Summary" log entry at the end of your shift regardless if there is beam or not.
- In general, Hall technical staff should not be contacted by the shift crew - please call the RC first.
- The target operator is required to supervise the cryo-target.
- Make sure to use the DVCS CODA configuration for all runs (even when taking single arm HRS data).
Delta Scans
- Note: Keep an eye on the white board in CC more detail
- Detailed instructions here
Harp Check
- Ask MCC to run the four harps in the ARC (these are named 1C07A, 1C07B and 1C18A, 1C18B)
- Current should be limited to 5 uA for this test
- Make sure that each harp scan shows three clear peaks