3. Collimator design and shielding (Rakitha)
 
3. Collimator design and shielding (Rakitha)
 +
Collimator Designing:
 +
Designing the beam intercepting collimator (Primary collimator) collaborating with engineering
 +
Shielding:
 +
Shielding beam intercepting collimator to minimize the radiation dose, especially neutron radiation.
 +
Pion Background:
 +
Implement new hadron background generator for MOLLER background studies by collaborating with W&M
  
 
4. Pion rate (W&M, Rakitha, Ciprian)
 
4. Pion rate (W&M, Rakitha, Ciprian)

Revision as of 14:57, 19 January 2016

Previous meeting: Tuesday, December 15, 2015 10AM ET

  • Pion simulations
  • Optical simualtions

Minutes

Here is the task list we discussed for the coming year:

1. Background study and systematic error study (Yuxiang) Maintain the analysis framework of systematic error estimation. Play with the quartz segmentation to study the correlations between different backgrounds.

2. Target length optimization (???) Play with target length (try 1.25m) to check the correlations of backgrounds, maybe the systematic error can be better than 1.5m design.

3. Collimator design and shielding (Rakitha) Collimator Designing: Designing the beam intercepting collimator (Primary collimator) collaborating with engineering Shielding: Shielding beam intercepting collimator to minimize the radiation dose, especially neutron radiation. Pion Background: Implement new hadron background generator for MOLLER background studies by collaborating with W&M

4. Pion rate (W&M, Rakitha, Ciprian) Study the pion rate as well as maintain/develop a reliable pion generator.

5. optical simulation (Yuxiang, anybody else?) Can be separated in to two parts, 1)Gas scintillation simulation with different light guide design, 2) real quartz simulation with different light guide design and different "cut" on quartz

6. Detector prototype (Yuxiang) Yuxiang will work with KK at SBU on this task.