Difference between revisions of "Tuesday, January 19, 2016 10AM ET"

From Hall A Wiki
Jump to: navigation, search
(Minutes)
(Minutes)
 
(2 intermediate revisions by the same user not shown)
Line 9: Line 9:
  
 
1. Background study and systematic error study (Yuxiang)
 
1. Background study and systematic error study (Yuxiang)
 +
 
Maintain the analysis framework of systematic error estimation.
 
Maintain the analysis framework of systematic error estimation.
 
Play with the quartz segmentation to study the correlations between
 
Play with the quartz segmentation to study the correlations between
Line 14: Line 15:
  
 
2. Target length optimization (???)
 
2. Target length optimization (???)
 +
 
Play with target length (try 1.25m) to check the correlations of
 
Play with target length (try 1.25m) to check the correlations of
 
backgrounds, maybe
 
backgrounds, maybe
Line 19: Line 21:
  
 
3. Collimator design and shielding (Rakitha)
 
3. Collimator design and shielding (Rakitha)
 +
 +
Collimator Designing: Designing the beam intercepting collimator (Primary collimator) collaborating with engineering
 +
 +
Shielding: Shielding beam intercepting collimator to minimize the radiation dose, especially neutron radiation.
  
 
4. Pion rate (W&M, Rakitha, Ciprian)
 
4. Pion rate (W&M, Rakitha, Ciprian)
 +
 
Study the pion rate as well as maintain/develop a reliable pion generator.
 
Study the pion rate as well as maintain/develop a reliable pion generator.
  
 
5. optical simulation (Yuxiang, anybody else?)
 
5. optical simulation (Yuxiang, anybody else?)
 +
 
Can be separated in to two parts, 1)Gas scintillation simulation with
 
Can be separated in to two parts, 1)Gas scintillation simulation with
 
different light guide design, 2) real quartz simulation with different
 
different light guide design, 2) real quartz simulation with different
Line 29: Line 37:
  
 
6. Detector prototype (Yuxiang)
 
6. Detector prototype (Yuxiang)
 +
 
Yuxiang will work with KK at SBU on this task.
 
Yuxiang will work with KK at SBU on this task.
  

Latest revision as of 15:19, 19 January 2016

Previous meeting: Tuesday, December 15, 2015 10AM ET

  • Pion simulations
  • Optical simualtions

Minutes

Here is the task list we discussed for the coming year:

1. Background study and systematic error study (Yuxiang)

Maintain the analysis framework of systematic error estimation. Play with the quartz segmentation to study the correlations between different backgrounds.

2. Target length optimization (???)

Play with target length (try 1.25m) to check the correlations of backgrounds, maybe the systematic error can be better than 1.5m design.

3. Collimator design and shielding (Rakitha)

Collimator Designing: Designing the beam intercepting collimator (Primary collimator) collaborating with engineering

Shielding: Shielding beam intercepting collimator to minimize the radiation dose, especially neutron radiation.

4. Pion rate (W&M, Rakitha, Ciprian)

Study the pion rate as well as maintain/develop a reliable pion generator.

5. optical simulation (Yuxiang, anybody else?)

Can be separated in to two parts, 1)Gas scintillation simulation with different light guide design, 2) real quartz simulation with different light guide design and different "cut" on quartz

6. Detector prototype (Yuxiang)

Yuxiang will work with KK at SBU on this task.




Return to Teleconferences
Return to MOLLER at 11 GeV E09-005