Difference between revisions of "Beam Line"

From Hall A Wiki
Jump to: navigation, search
 
(E06-010 Instrumentation Requirement List)
Line 1: Line 1:
== E06-010 Instrumentation Requirement List ==
+
== E06-010 Instrumentation Requirement List: JP's memo to Kees 08/07/08
 +
[http://hallaweb.jlab.org/experiment/transversity/wikifile/transn_requirement.doc .doc file]  and
 +
[http://hallaweb.jlab.org/experiment/transversity/wikifile/transn_requirement.htm htm file] ==
  
 
== ARC energy measurement ==
 
== ARC energy measurement ==

Revision as of 14:15, 7 August 2008

== E06-010 Instrumentation Requirement List: JP's memo to Kees 08/07/08 .doc file and htm file ==

ARC energy measurement

Compton Polarimeter

HARP and HARP scan procedures

Beam raster

Beam charge monitors (BCM) and calibration procedure

Beam position monitors (BPM) and calibration procedure

Moller polarimeter and results of measurements

HAPPEX Luminosity (Lumi) monitors