Revision as of 16:32, 15 February 2016
For the 12 GeV DVCS experiment, go to [DVCS3 wiki ].
For this Winter 2016 we are only scheduled for 10 week. Therefore we estimate that we will only be able to take the data points highlighted in green.
Run plan, Beam Energies include Injector Energy
Winter 2016 calorimeter calibration (elastic)
old stuff below
Previous version without injector energy: