Difference between revisions of "Run Plan (DVCS3)"
From Hall A Wiki
Line 9: | Line 9: | ||
− | [[Winter 2016 | + | |
+ | [[Winter 2016 optic plans]] | ||
[[Winter 2016 calorimeter calibration (elastic)]] | [[Winter 2016 calorimeter calibration (elastic)]] |
Revision as of 23:15, 22 February 2016
For the 12 GeV DVCS experiment, go to [DVCS3 wiki ].
For this Winter 2016 we are only scheduled for 10 week. Therefore we estimate that we will only be able to take the following kinematics: kin_36_[2-3] and kin_48_*
Run plan, Beam Energies include Injector Energy (Updated 19 Feb 2016, CEH)
- Full spreadsheet posted to https://hallaweb.jlab.org/dvcslog/12+GeV/333
Winter 2016 calorimeter calibration (elastic)