Difference between revisions of "Sunday, Mar. 06: DAY Shift"
From Hall A Wiki
(New page: Go back to Daily Run Plan Daily Run Plans <b>Previously...</b> * Production data (Kin48_3) <b>Specific mission</b> * Note: 1/ Continue production mode - 15uA through Compton ch...) |
|||
Line 8: | Line 8: | ||
+ | <b>Specific mission</b> | ||
+ | *** Continue production mode *** | ||
− | <b> | + | <b> last update Feb 29</b> |
− | * | + | * Polarized beam at 15 uA on LH2 15 cm through Compton chicane ! |
− | + | * DVCS is running kin_48_3 [[https://hallaweb.jlab.org/wiki/index.php/Run_Plan_%28DVCS3%29 here]], as off 02-29 10 am we have accumulate 1 C out of our goal of 4.7 C. | |
− | + | * LHRS is partially detuned: [[https://logbooks.jlab.org/entry/3384965 here]] | |
− | + | ||
− | + | ||
- LHRS=2.92GeV, Q1/Q2/Q3=1916.640(readout:1900)/1600/1600 (Q1 regul.OFF)<br> | - LHRS=2.92GeV, Q1/Q2/Q3=1916.640(readout:1900)/1600/1600 (Q1 regul.OFF)<br> | ||
- PreScaleR : PS1=PS2=PS3=1, && PS8=200<br> | - PreScaleR : PS1=PS2=PS3=1, && PS8=200<br> | ||
- PreScaleL : PS9 =1, + DVCS config. | - PreScaleL : PS9 =1, + DVCS config. | ||
− | + | ||
+ | * beam locks: no position lock, energy lock in Arc 2: [[https://logbooks.jlab.org/entry/3385399 here]] | ||
+ | * the straw chambers in the LHRS are off | ||
+ | * DVCS daq configuration is [[https://logbooks.jlab.org/entry/3385461 this one]], we are measuring about 2% DT at 15uA. | ||
+ | * Take Compton run every 2 h | ||
+ | |||
Line 34: | Line 39: | ||
* [https://hallaweb.jlab.org/wiki/index.php/Beamline Beamline commissioning how-to.] | * [https://hallaweb.jlab.org/wiki/index.php/Beamline Beamline commissioning how-to.] | ||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | <b>Please check more info on the white board in the Counting House ~!! </b> |
Revision as of 18:27, 5 March 2016
Go back to Daily Run Plan Daily Run Plans
Previously...
- Production data (Kin48_3)
Specific mission
- Continue production mode ***
last update Feb 29
- Polarized beam at 15 uA on LH2 15 cm through Compton chicane !
- DVCS is running kin_48_3 [here], as off 02-29 10 am we have accumulate 1 C out of our goal of 4.7 C.
- LHRS is partially detuned: [here]
- LHRS=2.92GeV, Q1/Q2/Q3=1916.640(readout:1900)/1600/1600 (Q1 regul.OFF)
- PreScaleR : PS1=PS2=PS3=1, && PS8=200
- PreScaleL : PS9 =1, + DVCS config.
- beam locks: no position lock, energy lock in Arc 2: [here]
- the straw chambers in the LHRS are off
- DVCS daq configuration is [this one], we are measuring about 2% DT at 15uA.
- Take Compton run every 2 h
BPM/Spot++ Check
- After beam lost for considerable time (like beam study, pass change,...)
- Ask MCC to run 5uA wth carbon hole target and make sure you can see the hole through Spot++
Please check more info on the white board in the Counting House ~!!