Difference between revisions of "Tuesday, Mar. 08: DAY Shift"

From Hall A Wiki
Jump to: navigation, search
 
(7 intermediate revisions by 2 users not shown)
Line 11: Line 11:
 
*** <b>Elastic measurement during DAY</b>
 
*** <b>Elastic measurement during DAY</b>
  
  - 6:30 am:
+
  - 6:30 AM:
 
       Beam Off, Call MCC to put Hall A in Controlled Access
 
       Beam Off, Call MCC to put Hall A in Controlled Access
 
       Starting Ramping HRS-L magnets to 0
 
       Starting Ramping HRS-L magnets to 0
  - 7:30 am:
+
 
 +
  - 7:30 AM:<B>Controlled Access</B>:
 
     Tech in Hall, Change HRS-L Polarity, Move Angle to 40.0 deg, Set Momentum = 2.5106 GeV/c, Q1 = 1900 Amp
 
     Tech in Hall, Change HRS-L Polarity, Move Angle to 40.0 deg, Set Momentum = 2.5106 GeV/c, Q1 = 1900 Amp
  - 8:30 am:
+
 
 +
  - 8:30 AM:
 
     Elastic Angle Calibration:
 
     Elastic Angle Calibration:
     DVCS Trigger s0 only in HRS trigger, Elastics with Calo in current Kin_048_3 setting [[https://hallaweb.jlab.org/wiki/index.php/Run_Plan_%28DVCS3%29 here]], 15 microAmp
+
     DVCS Trigger s0+s2m only in HRS trigger, Elastics with Calo in current Kin_048_3 setting [[https://hallaweb.jlab.org/wiki/index.php/Run_Plan_%28DVCS3%29 here]], 15 microAmp
  - 9:30 am Escorted Access
+
 
    Move Calo to 6 m, 14.0 deg      
+
  - 9:30 AM <B>Escorted Access</B>: Move Calo to 6 m, 14.0 deg  
  - 10:00   Elastic Energy Calibration data  20 microAmp
+
   
  - 10:30   Escorted Access, Move Calo to 13.1 deg
+
  - 10:00 AM Elastic Energy Calibration data  20 microAmp
  - 11:00   Elastic Energy Calibration data
+
 
  - 11:30   Escorted Access:  Move Calo to 12.25 deg
+
  - 10:30 AM <B>Escorted Access</B>: Move Calo to 13.1 deg
  - 12:00 Elastic Energy Calibration data
+
 
  - 12:30 Move Calo to Kin_48_2 setting:    15.184 deg, D=2.0 m,  10 micro Amp
+
  - 11:00 AM Elastic Energy Calibration data
  - 13:00 Angle Calibration Data
+
 
 +
  - 11:30 AM <B>Escorted Access</B>:  Move Calo to 12.25 deg
 +
 
 +
  - 12:00 PM Elastic Energy Calibration data
 +
 
 +
  - 12:30 PM <B>Escorted Access</B>: Move Calo to Kin_48_2 setting:    15.184 deg, D=2.0 m,  10 micro Amp
 +
 
 +
  - 01:00 PM Angle Calibration Data
 
     (This puts the central elastic 7.1 GeV electrons 2.0 blocks from the physical edge of the calorimeter.)
 
     (This puts the central elastic 7.1 GeV electrons 2.0 blocks from the physical edge of the calorimeter.)
  - 14:00 Controlled Access?
+
 
          Ramp down HRS-L
+
  - 02:00 PM <B>Controlled Access</B>?
 +
        Ramp down HRS-L
 
         Polarity, Angle change HRS-L to 20.244 deg to p = 3.996 GeV/c, Q1 = 1900 Amp
 
         Polarity, Angle change HRS-L to 20.244 deg to p = 3.996 GeV/c, Q1 = 1900 Amp
  - 15:00 Production DVCS at KIN_48_2[[https://hallaweb.jlab.org/wiki/index.php/Run_Plan_%28DVCS3%29 here]]
+
 
 +
  - 03:00 PM Production DVCS at KIN_48_2[[https://hallaweb.jlab.org/wiki/index.php/Run_Plan_%28DVCS3%29 here]]
  
  
 
*** <b>Back to Production run, Kin48_2 </b>
 
*** <b>Back to Production run, Kin48_2 </b>
 
** After Alex's work, Compton laser will be turned OFF !
 
** After Alex's work, Compton laser will be turned OFF !
* Polarized beam at 15 uA on LH2 15 cm! (out of chicane ? )
+
* Polarized beam at 9 uA on LH2 15 cm!
 
* DVCS is running kin_48_2 [[https://hallaweb.jlab.org/wiki/index.php/Run_Plan_%28DVCS3%29 here]]
 
* DVCS is running kin_48_2 [[https://hallaweb.jlab.org/wiki/index.php/Run_Plan_%28DVCS3%29 here]]
 
* LHRS is partially detuned: [[https://logbooks.jlab.org/entry/3384965 here]]
 
* LHRS is partially detuned: [[https://logbooks.jlab.org/entry/3384965 here]]
Line 70: Line 81:
  
 
<b>Please check more info on the white board in the Counting House ~!! </b>
 
<b>Please check more info on the white board in the Counting House ~!! </b>
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
<b>MCC Beam Team Meeting on Tuesday 1:30PM</b>
 +
 +
** Julie note from Beam Team Meeting at 1:30PM, Mar.8, 2016 at MCC.
 +
 +
* <b>Purpose</b>: Plans to run at 60uA
 +
 +
* <b>Current issues</b>:
 +
- There is no consensus on why the beam is limited at 30 uA.
 +
 +
* <b>Ideas</b>:
 +
- 1/ The limitation is in the injector
 +
- 2/ In the RF separator
 +
 +
* <b>Attempt</b>:
 +
- 1/ Removing/Changing Wien filter (horizontal-> vertical) ??
 +
- 2/ Run with a magnetic separation ??
 +
 +
* <b>Problem foresee</b>:
 +
 +
- 1/  ??
 +
- 2/ Compatible with Hall D taking data
 +
 +
* <b>GMp expert inform</b>:
 +
- 1/ Polarization is not matter
 +
- 2/ High current 60 uA should be deliverable for calibration and production both 4pass and 5pass
 +
 +
* <b>Concluded Plan</b>:
 +
- Try 60 uA Thursday morning up to noon

Latest revision as of 11:45, 9 March 2016

Go back to Daily Run Plan Daily Run Plans


Previously...

  • Production data (Kin48_3)



Specific mission

      • Elastic measurement during DAY
- 6:30 AM:
     Beam Off, Call MCC to put Hall A in Controlled Access
     Starting Ramping HRS-L magnets to 0
- 7:30 AM:Controlled Access:
    Tech in Hall, Change HRS-L Polarity, Move Angle to 40.0 deg, Set Momentum = 2.5106 GeV/c, Q1 = 1900 Amp
- 8:30 AM:
   Elastic Angle Calibration:
   DVCS Trigger s0+s2m only in HRS trigger, Elastics with Calo in current Kin_048_3 setting [here], 15 microAmp
- 9:30 AM  Escorted Access: Move Calo to 6 m, 14.0 deg    
   
- 10:00 AM Elastic Energy Calibration data  20 microAmp
- 10:30 AM Escorted Access: Move Calo to 13.1 deg
- 11:00 AM Elastic Energy Calibration data
- 11:30 AM Escorted Access:   Move Calo to 12.25 deg
- 12:00 PM Elastic Energy Calibration data
- 12:30 PM Escorted Access: Move Calo to Kin_48_2 setting:    15.184 deg, D=2.0 m,   10 micro Amp
- 01:00 PM Angle Calibration Data
   (This puts the central elastic 7.1 GeV electrons 2.0 blocks from the physical edge of the calorimeter.)
- 02:00 PM Controlled Access?
        Ramp down HRS-L
        Polarity, Angle change HRS-L to 20.244 deg to p = 3.996 GeV/c, Q1 = 1900 Amp
- 03:00 PM Production DVCS at KIN_48_2[here]


      • Back to Production run, Kin48_2
    • After Alex's work, Compton laser will be turned OFF !
  • Polarized beam at 9 uA on LH2 15 cm!
  • DVCS is running kin_48_2 [here]
  • LHRS is partially detuned: [here]
- LHRS=3.996GeV, Q1/Q2/Q3=1916.640(readout:1900)/1600/1600 (Q1 regul.OFF)
- PreScaleR : PS1=PS2=PS3=1, && PS8=200
- PreScaleL : PS9 =1, + DVCS config.
  • beam locks: no position lock, energy lock in Arc 2: [here]
  • DVCS daq configuration is [this one], we are measuring about 2% DT at 15uA.







BPM/Spot++ Check

  • After beam lost for considerable time (like beam study, pass change,...)
  • Ask MCC to run 5uA wth carbon hole target and make sure you can see the hole through Spot++




Please check more info on the white board in the Counting House ~!!










MCC Beam Team Meeting on Tuesday 1:30PM

    • Julie note from Beam Team Meeting at 1:30PM, Mar.8, 2016 at MCC.
  • Purpose: Plans to run at 60uA
  • Current issues:
- There is no consensus on why the beam is limited at 30 uA. 
  • Ideas:
- 1/ The limitation is in the injector 
- 2/ In the RF separator
  • Attempt:
- 1/ Removing/Changing Wien filter (horizontal-> vertical) ??
- 2/ Run with a magnetic separation ??
  • Problem foresee:
- 1/  ?? 
- 2/ Compatible with Hall D taking data
  • GMp expert inform:
- 1/ Polarization is not matter
- 2/ High current 60 uA should be deliverable for calibration and production both 4pass and 5pass
  • Concluded Plan:
- Try 60 uA Thursday morning up to noon