* In this morning (6AM), we had CODA crash and not came back on due to no responding of ROC4 & 5
 
* In this morning (6AM), we had CODA crash and not came back on due to no responding of ROC4 & 5
 
  - Alex went to check crate during escorted access and found remote reset switch was not responding correctly (off but not on)
 
  - Alex went to check crate during escorted access and found remote reset switch was not responding correctly (off but not on)
  - He needs to access hall during the beam study(2nd part of beam study) to resolve this issue.
+
  - He needs to access hall during the beam study(2nd part of beam study) to resolve this issue (Left HRS Fastbus power remote switch)
  
  
 
<b>MCC meeting in the morning</b>
 
<b>MCC meeting in the morning</b>
* Tomorrow beams study, MCC will start to investigate inject first and look at the RF separator will be followed by in order to check the capability of high current 60uA for Hall-A. This is the first part of beam study with highest priority, therefore Hall-A will be remained the lock-up mode.  
+
* Tomorrow beams study, MCC will start to investigate inject first and look at the RF separator followed by in order to check the capability of high current 60uA for Hall-A. This is the first part of the beam study with the highest priority therefore, Hall-A will be remained the lock-up mode.  
 
* As soon as MCC investigation is done, they will switch to their own beam study. At this time, Hall-A can ask for controlled access for our purpose.
 
* As soon as MCC investigation is done, they will switch to their own beam study. At this time, Hall-A can ask for controlled access for our purpose.
  - I see Alex need an access (1hr with full survey ??)
+
  - I see Alex needs an access for DAQ ROC4/5 (<1hr with full (escorted) survey ?)
  
  
Line 39: Line 39:
  
  
 
+
<b><font color=red>MCC cut off beam at 3:00PM for CHL issue</font></b>
 
+
* PD/Crew chief call they cut off the beam from now on due to CHL issue.
 +
* Estimated down time will be a week.
 +
* Notified to target group and asked if we secure a target cold or not.
  
  

Latest revision as of 16:04, 9 March 2016

Go back to Daily Run Plan Daily Run Plans


Previously...

  • Production data (Kin48_2)
  • Pointing run
  • Golden file from production run


Specific mission

      • Production run, Kin48_2
  • Polarized beam at 10 uA on LH2 15 cm!
  • DVCS is running kin_48_2 [here]
  • LHRS is partially detuned: [here]
- LHRS=3.996GeV, Q1/Q2/Q3=1916.640(readout:1900)/1600/1600 (Q1 regul.OFF)
- PreScaleR : PS1=PS2=PS3=1, && PS8=200
- PreScaleL : PS9 =1, + DVCS config.
  • beam locks: no position lock, energy lock in Arc 2: [here]
  • DVCS daq configuration is [this one], we are measuring about 2% DT at 15uA.



Issue

  • In this morning (6AM), we had CODA crash and not came back on due to no responding of ROC4 & 5
- Alex went to check crate during escorted access and found remote reset switch was not responding correctly (off but not on)
- He needs to access hall during the beam study(2nd part of beam study) to resolve this issue (Left HRS Fastbus power remote switch)


MCC meeting in the morning

  • Tomorrow beams study, MCC will start to investigate inject first and look at the RF separator followed by in order to check the capability of high current 60uA for Hall-A. This is the first part of the beam study with the highest priority therefore, Hall-A will be remained the lock-up mode.
  • As soon as MCC investigation is done, they will switch to their own beam study. At this time, Hall-A can ask for controlled access for our purpose.
- I see Alex needs an access for DAQ ROC4/5 (<1hr with full (escorted) survey ?)


Discussion for plan

  • Need a discussion what we want for polarization measurement either Mott measurement or Moller on Friday


MCC cut off beam at 3:00PM for CHL issue

  • PD/Crew chief call they cut off the beam from now on due to CHL issue.
  • Estimated down time will be a week.
  • Notified to target group and asked if we secure a target cold or not.


BPM/Spot++ Check

  • After beam lost for considerable time (like beam study, pass change,...)
  • Ask MCC to run 5uA wth carbon hole target and make sure you can see the hole through Spot++




Please check more info on the white board in the Counting House ~!!