Difference between revisions of "Friday, Apr. 1: DAY Shift"
From Hall A Wiki
(New page: Go back to Daily Run Plan Daily Run Plans <b>Previously...</b> * Production running on LH2 <br> == Tentative plan == <br> <b>Friday</b><br> 1/ During the day shift ARC energy meas...) |
|||
Line 11: | Line 11: | ||
<b>Friday</b><br> | <b>Friday</b><br> | ||
1/ During the day shift ARC energy measurement (Doug)<br> | 1/ During the day shift ARC energy measurement (Doug)<br> | ||
+ | HALOG: [https://logbooks.jlab.org/entry/3394134], [https://logbooks.jlab.org/entry/3394169], [https://logbooks.jlab.org/entry/3394171] | ||
<br> | <br> | ||
Latest revision as of 00:46, 2 April 2016
Go back to Daily Run Plan Daily Run Plans
Previously...
- Production running on LH2
Tentative plan
Friday
1/ During the day shift ARC energy measurement (Doug)
HALOG: [1], [2], [3]
Specific mission
- Production on LH2
DVCS: Kin_48_4
- 15uA
- LH2 target
- DVCS ON
- Calo_theta= 10.1(deg), Distance = 2.5m (from target) - LHRS=3.36GeV, angle=24.925(deg), Q1/Q2/Q3=1916.640(readout:1900)/1600/1600 (Q1 regul.OFF)
- RHRS=2.204GeV, angle=48.75(deg)
- PreScaleR : PS1=PS2=PS3=1, && PS8=200
- PreScaleL : PS9 =1, + DVCS config.
- Raster : 2x2mm^2
BPM/Spot++ Check
- After a period of 3 hours or more without beam (like beam study, pass change,...) ask MCC to run 5uA 2 by 2 rastered beam on the carbon hole target and make sure you can see the hole (use Spot++ to analyze the C hole run)