Difference between revisions of "APEX Experimental Readiness Review 2016"
From Hall A Wiki
(→Agenda (talks)) |
(→Experimental Readiness Review 2016) |
||
Line 7: | Line 7: | ||
* '''Date:''' 07 April 2016 (Thursday) <br> | * '''Date:''' 07 April 2016 (Thursday) <br> | ||
* '''Location:''' JLab CEBAF Room F224-F225 <br> | * '''Location:''' JLab CEBAF Room F224-F225 <br> | ||
+ | * '''ERR Committee''' ([http://hallaweb.jlab.org/experiment/APEX/ERR/APEX_ERR_Committee.pdf pdf]) | ||
+ | * ''' ERR Charge ''' ([http://hallaweb.jlab.org/experiment/APEX/ERR/APEX_ERR_Charge.pdf pdf]) | ||
=='''Agenda''' ([http://hallaweb.jlab.org/experiment/APEX/ERR/ talks])== | =='''Agenda''' ([http://hallaweb.jlab.org/experiment/APEX/ERR/ talks])== |
Revision as of 14:52, 4 April 2016
Overview
Experimental Readiness Review 2016
Time and Location
- Date: 07 April 2016 (Thursday)
- Location: JLab CEBAF Room F224-F225
- ERR Committee (pdf)
- ERR Charge (pdf)
Agenda (talks)
8:30 | Closed Session , ERR Committee (pdf) | |
9:00 | Remarks from Chair and Charge (pdf) | Chair, ERR Committee |
9:10 | Physics overview (pdf) | Rouven Essig (15+5) |
9:30 | Charge Item 1&5: Design of the beam line items (excluding target) (pdf) | Robin Wines (20+10) |
10:00 | Charge Item 2&5: Target design, thermal analysis and plans for the target (including decommissioning) (pdf) | Silviu Covrig (20+15) |
10:35 | Break | |
10:50 | Charge Item 3: Beam line magnetic shielding, beam analysis and commissioning (pptx) | Yves Roblin (15+10) |
11:15 | Charge Item 4: Radiation level analysis (pdf) | Maduka Kaluarachchi (20+15) |
11:50 | Charge Item 5: Status of equipment (detectors) (pdf) | Gregg Franklin (15+5) |
12:10 | Working Lunch | |
Afternoon | ||
13:30 | Charge Items 6&7: Equipment installation plan (pdf) | Jessie Butler (20+10) |
14:15 | Charge Item 8: Responsibilities for carrying out each job (pdf) | Bogdan Wojtsekhowski (10+5) |
14:30 | Charge Item 9: Documentation for all (pdf) | Philip Schuster (15+5) |
Draft of COO (pdf) | ||
Draft of ERG (pdf) | ||
Draft of ESAD (pdf) | ||
Input for RSAD from Radcon (radiation budget form) (pdf) | ||
14:50 | Charge Item 9: Readiness of DAQ full rate capability (pdf) | Kalyan Allada (10+5) |
15:05 | Charge Item 9: High-rate events analysis (pdf) | Seamus Riordan (10+5) |
15:20 | Closed Session | |
18:10 | Close Out |