− | * <b>Still 4 pass here, but spectrometer moved for DVCS calibration and then moved back before the following runs</b> | + | * <b>Still 4 pass here, but spectrometer moved for DVCS calibration and then moved back before the following runs. Raster size in MCC unit also changed (check image of carbon hole target and raster current in start- and end-of-run for details)</b> |
| <table border="1" style="width:80%"> | | <table border="1" style="width:80%"> |
| <tr> | | <tr> |
Revision as of 16:05, 9 April 2016
BPM calibration runs (Bull's eye scan)
Relative position |
LHRS CODA run |
RHRS CODA run |
Harp scan entry no. |
(0,0) |
12454 |
21781 |
3379157 |
(2,2) |
12455 |
21782 |
3379165 |
(2,-2) |
12456 |
21783 |
3379172 |
(-2,-2) |
12457 |
21784 |
3379184 |
(-2,2) |
12458 |
21785 |
3379191 |
(0,0) |
12459 |
21786 |
3379201 |
BCM calibration runs
LHRS CODA run |
RHRS CODA run |
BCM logger |
Comments |
12382 |
21731 |
/a/opsuser/hacuser/BCMLOG/bcm_log_02-07-2016-23-24-07.log |
|
12514 |
21807 |
/a/opsuser/hacuser/BCMLOG/bcm_log_02-16-2016-20-07-42.log |
The details can be found in halog entry 3380376 and comment therein |
12916 |
22097 |
/a/opsuser/hacuser/BCMLOG/bcm_log_03-04-2016-09-40-14.log |
Max 30uA (see strip chart); comments and halog entry about beam loss |
Elastic production runs
- 2nd Pass (Ebeam = 4.5 GeV)
Run number |
Target |
Raster |
Ebeam [GeV] |
P0 [GeV/c] |
θe [deg] |
Q2 [GeV2] |
Comment |
21799 |
15cm LH2 |
2 x 2 mm2 |
4.481 |
1.547 |
52.91 |
5.5 |
Only one set of raster coils is in use; ps1,2,3=1, ps8=100 |
21809 - 21820 |
15cm LH2 |
2 x 2 mm2 |
4.481 |
1.547 |
52.91 |
5.5 |
Only one set of raster coils is in use; ps1,2,3=1, ps8=100; Signals for 16 straws missing in all three V planes |
21824 - 21831 |
15cm LH2 |
2 x 2 mm2 |
4.481 |
1.547 |
52.91 |
5.5 |
Same as above |
21832 |
15cm LH2 |
2 x 2 mm2 |
4.481 |
1.547 |
52.91 |
5.5 |
Beam tripped in the middle of this run, production only lasted for an hour (run time is about 3 hours); same as above |
21844 - 21857 |
15cm LH2 |
2 x 2 mm2 |
4.481 |
1.547 |
52.91 |
5.5 |
Straw chamber issues in V2 plane still exist |
21869 - 21871 |
15cm LH2 |
2 x 2 mm2 |
4.481 |
1.547 |
52.91 |
5.5 |
Same as above |
21872 |
15cm LH2 |
2 x 2 mm2 |
4.481 |
1.547 |
52.91 |
5.5 |
Beam turned off 30 mins after run started; same as above |
21875 |
15cm LH2 |
2 x 2 mm2 |
4.481 |
1.547 |
52.91 |
5.5 |
Asked MCC to restore beam position 25 mins after run started; Straw chamber issues in V2 plane still exist |
21876 - 21887 |
15cm LH2 |
2 x 2 mm2 |
4.481 |
1.547 |
52.91 |
5.5 |
Straw chamber issues in V2 plane still exist |
21889 - 21893 |
15cm LH2 |
2 x 2 mm2 |
4.481 |
1.547 |
52.91 |
5.5 |
Straw chamber issues in V2 plane still exist |
21894 |
15cm LH2 |
2 x 2 mm2 |
4.481 |
1.547 |
52.91 |
5.5 |
Beam position moving second half of run; straw chamber issues in V2 plane still exist |
21895 |
15cm LH2 |
2 x 2 mm2 |
4.481 |
1.547 |
52.91 |
5.5 |
Last 16 minutes no beam; straw chamber issues in V2 plane still exist |
21896 |
15cm LH2 |
2 x 2 mm2 |
4.481 |
1.547 |
52.91 |
5.5 |
Straw chamber issues in V2 plane still exist |
21897 |
15cm LH2 |
2 x 2 mm2 |
4.481 |
1.547 |
52.91 |
5.5 |
Last 25 minutes no beam; straw chamber issues in V2 plane still exist |
21898 |
15cm LH2 |
2 x 2 mm2 |
4.481 |
1.547 |
52.91 |
5.5 |
Straw chamber issues in V2 plane still exist |
21900 - 21901 |
15cm LH2 |
2 x 2 mm2 |
4.481 |
1.547 |
52.91 |
5.5 |
Straw chamber issues in V2 plane still exist |
21903 - 21915 |
15cm LH2 |
2 x 2 mm2 |
4.481 |
1.547 |
52.91 |
5.5 |
Straw chamber issues in V2 plane still exist |
21918 - 21925 |
15cm LH2 |
2 x 2 mm2 |
4.481 |
1.547 |
52.91 |
5.5 |
Straw chamber issues in V2 plane still exist |
- 4th Pass (Ebeam = 8.8 GeV)
Run number |
Target |
Raster |
Ebeam [GeV] |
P0 [GeV/c] |
θe [deg] |
Q2 [GeV2] |
Comment |
22027 - 22034, 22036 - 22044, 22047 - 22055, 22058 - 22062 |
15cm LH2 |
2 x 2 mm2 |
8.841 |
2.101 |
48.75 |
12.65 |
ps1,2,3=1, ps8=200 |
22067 |
15cm LH2 |
2 x 2 mm2 |
8.841 |
2.101 |
48.75 |
12.65 |
Very short run; ps1,2,3=1, ps8=200 |
22076 - 22077 |
15cm LH2 |
2 x 2 mm2 |
8.841 |
2.101 |
48.75 |
12.65 |
ps1,2,3=1, ps8=200 |
22079 |
15cm LH2 |
2 x 2 mm2 |
8.841 |
2.101 |
48.75 |
12.65 |
Very short run; ps1,2,3=1, ps8=200 |
22080 |
15cm LH2 |
2 x 2 mm2 |
8.841 |
2.101 |
48.75 |
12.65 |
Very short run; 10uA; ps1,2,3=1, ps8=200 |
22081 - 22083 |
15cm LH2 |
2 x 2 mm2 |
8.841 |
2.101 |
48.75 |
12.65 |
Beam very trippy; 10uA; ps1,2,3=1, ps8=200 |
22085 - 22087 |
15cm LH2 |
2 x 2 mm2 |
8.841 |
2.101 |
48.75 |
12.65 |
10uA; ps1,2,3=1, ps8=200 |
22088 |
15cm LH2 |
2 x 2 mm2 |
8.841 |
2.101 |
48.75 |
12.65 |
Very short run; 10uA; ps1,2,3=1, ps8=200 |
22093 - 22095 |
15cm LH2 |
2 x 2 mm2 |
8.841 |
2.101 |
48.75 |
12.65 |
ps1,2,3=1, ps8=200 |
22098 - 22102 |
15cm LH2 |
2 x 2 mm2 |
8.841 |
2.101 |
48.75 |
12.65 |
ps1,2,3=1, ps8=200 |
22103 - 22108 |
15cm LH2 |
2 x 2 mm2 |
8.841 |
2.101 |
48.75 |
12.65 |
ps1,2,3=1, ps8=200 |
22114 |
15cm LH2 |
2 x 2 mm2 |
8.841 |
2.101 |
48.75 |
12.65 |
No beam during last 25 mins; ps1,2,3=1, ps8=200 |
22115 - 22128 |
15cm LH2 |
2 x 2 mm2 |
8.841 |
2.101 |
48.75 |
12.65 |
ps1,2,3=1, ps8=200 |
22130 - 22154 |
15cm LH2 |
2 x 2 mm2 |
8.841 |
2.101 |
48.75 |
12.65 |
ps1,2,3=1, ps8=200; beam off for much of run 22146 |
22155 - 22157 |
15cm LH2 |
2 x 2 mm2 |
8.841 |
2.101 |
48.75 |
12.65 |
ps1,2,3=1, ps8=200; 5 uA |
22158 - 22160 |
15cm LH2 |
2 x 2 mm2 |
8.841 |
2.101 |
48.75 |
12.65 |
ps1,2,3=1, ps8=200 |
22161 |
15cm LH2 |
2 x 2 mm2 |
8.841 |
2.101 |
48.75 |
12.65 |
ps1,2,3=1, ps8=200; very short run |
22162-22167 |
15cm LH2 |
2 x 2 mm2 |
8.841 |
2.101 |
48.75 |
12.65 |
ps1,2,3=1, ps8=200; these are all short runs (about 30-40 mins) |
22168-22172 |
15cm LH2 |
2 x 2 mm2 |
8.841 |
2.101 |
48.75 |
12.65 |
ps1,2,3=1, ps8=200 |
22174-22181 |
15cm LH2 |
2 x 2 mm2 |
8.841 |
2.101 |
48.75 |
12.65 |
ps1,2,3=1, ps8=200 |
- Still 4 pass here, but spectrometer moved for DVCS calibration and then moved back before the following runs. Raster size in MCC unit also changed (check image of carbon hole target and raster current in start- and end-of-run for details)
Run number |
Target |
Raster |
Ebeam [GeV] |
P0 [GeV/c] |
θe [deg] |
Q2 [GeV2] |
Comment |
22263 - 22264 |
15cm LH2 |
2 x 2 mm2 |
8.841 |
2.101 |
48.75 |
12.65 |
ps1,2,3=1, ps8=200 |
- 5th Pass (Ebeam = 11.0 GeV)
Run number |
Target |
Raster |
Ebeam [GeV] |
P0 [GeV/c] |
θe [deg] |
Q2 [GeV2] |
Comment |
22196-22197,22202-22207, 22209-22212 |
15cm LH2 |
2 x 2 mm2 |
11.021 |
2.204 |
48.75 |
16.54 |
ps1,2,3=1, ps8=200 |
22225-22229, 22235-22236, 22238, 22240-22241 |
15cm LH2 |
2 x 2 mm2 |
11.021 |
2.204 |
48.75 |
16.54 |
ps1,2,3=1, ps8=200 |
Runs on dummy target
Run number |
Target |
Raster |
Ebeam [GeV] |
P0 [GeV/c] |
θe [deg] |
Comment |
21916 |
15cm dummy |
2 x 2 mm2 |
4.481 |
1.547 |
52.91 |
Only one set of raster coils is in use; ps1,2,3=1, ps8=100;short dummy run at 10 uA; hydrogen elastic |
21917 |
15cm dummy |
2 x 2 mm2 |
4.481 |
1.547 |
52.91 |
Only one set of raster coils is in use; ps1,2,3=1, ps8=100;dummy run at 15 uA, 20 minutes no beam middle of run; hydrogen elastic |
21936 |
15cm dummy |
2 x 2 mm2 |
4.481 |
0.85 |
52.91 |
Only one set of raster coils is in use; ps1,2,3=1, ps8=100; inelastic kinematics |
21937 |
15cm dummy |
2 x 2 mm2 |
4.481 |
0.85 |
52.91 |
Only one set of raster coils is in use; ps1,2,3=1, ps8=100; inelastic kinematics |
Spectrometer pointing runs
Run number |
Target |
Raster |
Ebeam [GeV] |
P0 [GeV/c] |
θe [deg] |
Comment |
21928 - 21929 |
Multi-foil carbon |
Off |
4.48 |
0.85 |
52.91 |
ps1,2,3=1, ps8=100 |
12650 - 12651 |
Multi-foil carbon |
Off |
4.48 |
1.485 |
37.14 |
DVCS config, ps9=1 |
22110 |
Multi-foil carbon |
Off |
8.841 |
0.85 |
48.75 |
ps1,2,3=1, ps8=100 |
22173 |
Multi-foil carbon |
Off |
8.841 |
2.101 |
48.75 |
ps1,2,3=1, ps8=200 |
Inelastic runs on LH2
Run number |
Target |
Raster |
Ebeam [GeV] |
P0 [GeV/c] |
θe [deg] |
Comment |
21938 - 21939 |
15cm LH2 |
2 x 2 mm2 |
4.48 |
0.85 |
52.91 |
ps1,2,3=1, ps8=100 |
Optics commissioning runs
- A full description of the run plan can be found here.
- Survey results of spectrometer positions can be found here.
- Step R1: Procedure with Sieve-slit
Run number |
Target |
Sieve |
Raster |
Ebeam [GeV] |
P0 [GeV/c] |
θe [deg] |
Comment |
21950 - 21967, 21969 - 21972 |
Multi-foil carbon |
Yes |
Off |
2.30 |
0.75 |
48.75 |
ps1,2,3=1; Beam position not stable for runs 21950,21951; Straw chamber missing signals restored before run 21950 |
21973 - 21974 |
Single-foil carbon |
Yes |
Off |
2.30 |
0.75 |
48.75 |
ps1,2,3=1 |
21988, 21990 - 21991 |
Single-foil carbon |
Yes |
Off |
2.30 |
0.75 |
48.75 |
ps1,2=1,ps3=0; Noise in Cherenkov spectrum and VDC, straw chamber hit patterns is seen when triggering on s2m&&GC |
21992-21995 |
15cm LH2 |
Yes |
2x2 mm2 |
2.30 |
0.75 |
48.75 |
ps1,2=1, ps3=0; Noise in Cherenkov spectrum and VDC, straw chamber hit patterns is seen when triggering on s2m&&GC |
- Step R2: Delta Scan with Proton Elastic (without sieve slit)
Run number |
Target |
Sieve |
Raster |
Ebeam [GeV] |
P0 [GeV/c] |
θe [deg] |
Comment |
22006 |
15cm LH2 |
No |
2 x 2 mm2 |
2.30 |
1.304 |
48.75 |
Delta scan ΔP=-4%; ps1,2=1 |
22007 |
15cm LH2 |
No |
2 x 2 mm2 |
2.30 |
1.279 |
48.75 |
Delta scan ΔP=-2%; ps1,2=1 |
22008 |
15cm LH2 |
No |
2 x 2 mm2 |
2.30 |
1.254 |
48.75 |
Delta scan ΔP=0%; ps1,2=1 |
22011 |
15cm LH2 |
No |
2 x 2 mm2 |
2.30 |
1.229 |
48.75 |
Delta scan ΔP=+2%; statistics a bit low; ps1,2=1 |
22013 |
15cm LH2 |
No |
2 x 2 mm2 |
2.30 |
1.203 |
48.75 |
Delta scan ΔP=+4%; ps1,2=1; dipole not stable in run 22012 |
- Step R3: Dummy Target Runs
Run number |
Target |
Sieve |
Raster |
Ebeam [GeV] |
P0 [GeV/c] |
θe [deg] |
Comment |
22009 - 22010 |
15cm dummy |
No |
2 x 2 mm2 |
2.30 |
1.254 |
48.75 |
ps1,2=1 |
Beam energy measurement
- This is a collection of halog entries on the beam energy measurement. It might not be complete, and some of them might not be useful. I just keep them here for future reference.
*1st Pass Bdl Measurement (beam not yet to the hall)
*Bdl for flat orbit through ARC
*QuickPic - harps C18A/C18B for energy measurement
*NMR after restoration
*Wien Angle For Hall A @ 8.8 GeV
*Hall A 8.843 GeV ARC Central Ray (Bdl & NMR)
*9th Dipole Bdl / NMR / Current (central ray energy 8841 MeV)
*Current Beam Energy In Hall A ~ 8845 MeV (by different techniques)
*Dispersive Orbit (8842 MeV)
*Minor Bdl Change
*Larger Wien Angle Consistent with ARC Energy Measurement Results
*4th Pass Bdl & Current Check Before I vs. Bdl Scan
*Hall A 9th Dipole Map (downward)
*9th Dipole Mapping Issues | NMR & Position Working
*9th Dipole Mapping Issues | Follow-up
*Follow-up Re: Hall A 9th Dipole Map (downward)
*9th Diple Bdl Scan (upward)
*~11 GeV Bdl Measurement
*9th Dipole Scan (upward, 100 A steps)
*9th Dipole 532.7A Bdl
*Finished 9th Dipole Scans
*Spin precession for Hall A @ 5-pass
*ARC1 & 2 Measured Beam Energy After Long Down
*11GeV 5th Pass Hall A ARC Energy (Bdl only)
*Monitoring ARC NMR from "cold start" of the magnet
*11 GeV Dispersive Orbit !!
*Shift in Bdl
Some cosmic runs
Run number |
Comment |
22024 - 22025, 22065 |
ps1,2,3=1, ps8=200 |
22066 |
Beam back to the hall in the last four hours of the run; ps1,2,3=1, ps8=200 |
22073 |
ps1,2,3=1, ps8=200 |
22074 |
Beam back to the hall in the last one and a half hours of the run; ps1,2,3=1, ps8=200 |