Difference between revisions of "Preparations-DOE2016-Nov-Review"
From Hall A Wiki
(→DOE 2015 review ( Nov 7 and 8th )) |
(→DOE 2015 review ( Nov 7 and 8th )) |
||
Line 12: | Line 12: | ||
**[https://cnidlamp.jlab.org/SBS-experiments/JDocDB/system/files/biblio/2016/05/report_on_ecal_prototype_test-ver3.pdf Report] on the thermal annealing test of prototype calorimeter. | **[https://cnidlamp.jlab.org/SBS-experiments/JDocDB/system/files/biblio/2016/05/report_on_ecal_prototype_test-ver3.pdf Report] on the thermal annealing test of prototype calorimeter. | ||
**[https://hallaweb.jlab.org/wiki/index.php/SBS_DOE_Monthly_Reports Monthly reports] | **[https://hallaweb.jlab.org/wiki/index.php/SBS_DOE_Monthly_Reports Monthly reports] | ||
− | **Recommendations tracker | + | **[https://hallaweb.jlab.org/wiki/images/5/51/Response_to_DOE_2015_November_SBS_Review.pdf Recommendations tracker document] |
**Conceptual design report for the polarize 3He target | **Conceptual design report for the polarize 3He target | ||
+ | **Report on trigger and DAQ |
Revision as of 16:45, 20 July 2016
Response to DOE 2015 review report
- report from DOE Nov 2015 SBS review.
- DOE Nov 2015 recommendations with responses. Initial response to the recommendations and comments.
DOE 2015 review ( Nov 7 and 8th )
- Agenda.
- Initial Drafts due by October 3rd for posting to wiki and overview by collaboration.
- Dry run talks sometime between Oct 17-28th. Talk are due to Review committee by Nov 3rd.
- Background Material (provide to Review committee by Oct 24th)
- PMP
- Report on the thermal annealing test of prototype calorimeter.
- Monthly reports
- Recommendations tracker document
- Conceptual design report for the polarize 3He target
- Report on trigger and DAQ