Difference between revisions of "Fall 2016 optic plans"

From Hall A Wiki
Jump to: navigation, search
Line 54: Line 54:
 
     <td height=15 style='height:15.0pt'>Target</td>
 
     <td height=15 style='height:15.0pt'>Target</td>
 
     <td >Estimated Rates [Hz]</td>
 
     <td >Estimated Rates [Hz]</td>
     <td >estimated time</td>
+
     <td >Estimated time</td>
     <td >actual rates [Hz]</td>
+
     <td >Actual rates [Hz]</td>
     <td width=20% >run number</td>
+
     <td width=20% >Run number</td>
     <td width=20% >#event in the run</td>
+
     <td width=20% >#Event in the run</td>
 
   </tr>
 
   </tr>
 
   <tr>
 
   <tr>

Revision as of 10:39, 5 September 2016

Back to [Fall 2016 DVCS run plan]

Assuming we only need one setting for the new Q1.

This proposition has been made on the basis of Winter 2016 run plan, and experience of what happened and what was really used.


Proposition of LHRS run plan (still needs to be integrated with RHRS run plan)

LHRS step Approximate beam time Goals
L1 (sieve) 1h30 20 uA DIS with sieve slit on optics foils
L2 (NO sieve) 1h - 1h30 Delta Elastic on LH2, 20 uA





One pass program

Ebeam= 2.217 GeV
LHRS θe=16.5 deg
LHRS DAQ: S2+Cer (T3), Use LHRNEW for DAQ configuration. See [section 5.2 in DVCS shift howto] for complete procedure!.  
Energy and position lock should be on.
The DVCS calorimeter HVs need to be off

==== Step L1: Procedure with Sieve-slit (DIS) ====
The DVCS calorimeter HVs need to be off
P0= 1.0 [GeV/c] (DIS)
If the LHRS goes to a new higher momentum setting, Q2 and Q3 need to be cycled.
Simply leave the regulation ON for Q1.
Beam current : 20uA
Q2= 0.182 GeV2
W= 1.727 GeV

Target Estimated Rates [Hz] Estimated time Actual rates [Hz] Run number #Event in the run
Optics
no raster
300 1h (or at least 100k electron events)      
C single foil
no raster
60 20 min (or at least 72k electron events)      

==== Step L2: Delta Scan with Proton Elastic (NO sieve) ====

The DVCS calorimeter HVs need to be off
If the LHRS goes to a higher momentum setting, Q2 and Q3 need to be cycled.
Simply leave the regulation ON for Q1.  
LHRS θe=16.5 deg
We are going to need to check the rates before we take these data, to be safe. But from experience from Winter 2016, 20 μA should be ok.
Run duration 6-8 minutes each (It was enough during Winter 2016 experience) (We want at least 10k electron events).
Raster ON


Target: 15cm LH2
k' [GeV] Delta P [%] run number number of trigger
2.1 1.04    
2.06 1.02    
2.02 1.00    
1.98 0.98    
1.94 0.96