Difference between revisions of "Right Quad Tuning 2pass 48d"

From Hall A Wiki
Jump to: navigation, search
(Procedure without Sieve-slit)
(Procedure without Sieve-slit)
Line 1: Line 1:
 
==== Procedure without Sieve-slit ====
 
==== Procedure without Sieve-slit ====
 
* <b>Kinematics need to be updated!</b>
 
* <b>Kinematics need to be updated!</b>
* Time estimate: 2 hours
+
* Time estimate: 1-2 hours
  
 
  * Take a run at the following kinematics without the sieve-slit collimator.
 
  * Take a run at the following kinematics without the sieve-slit collimator.

Revision as of 21:48, 29 September 2016

Procedure without Sieve-slit

  • Kinematics need to be updated!
  • Time estimate: 1-2 hours
* Take a run at the following kinematics without the sieve-slit collimator.
* Start with initial right HRS spectrometer tune with the new quad in place of right Q1.
* If you need to increase the spectrometer momentum setting, make sure you cycle Q2 and Q3 as per the cycling procedure.
* Electron rates assume 11 carbon foils, 5 mSr acceptance, and 8% delta acceptance.
* A GMp expert will check the data quality and decide, if the right HRS tune needs to be adjusted to change the size of the acceptance.
* This process will be repeated until the spectrometer tune is satisfactory.
Ebeam [GeV] P0 [GeV/c] θe [deg] Q2 [GeV2] W [GeV] Rate [Hz] at 20 μA minutes for 87k events at 20 μA
2.217 0.85 48.75 1.28 1.47 145 10

We want to take runs with the following Q1 currents:

  1. 0%: 159.75 A
  2. -6%: 150.165 A
  3. -5%: 151.7625 A
  4. -4%: 153.36 A
  5. -3%: 154.9575 A
  6. +5%: 167.7375 A