Difference between revisions of "Requested Spectrometer Pointing Surveys"

From Hall A Wiki
Jump to: navigation, search
 
(2 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
<b>During each pass change, we require a spectrometer pointing survey for the Left HRS and sometimes for the Right HRS. </b>
 
<b>During each pass change, we require a spectrometer pointing survey for the Left HRS and sometimes for the Right HRS. </b>
  
* LHRS: &theta; = 42.0 (after first pass optics)
+
* LHRS: &theta; = 42.0<sup>o</sup> (after first pass optics)
* RHRS: &theta; = 48.75 (after first pass optics)
+
* RHRS: &theta; = 48.75<sup>o</sup> (after first pass optics)
 +
* LHRS: &theta; = 30.9<sup>o</sup> (after fourth pass production)
 +
* RHRS: &theta; = 55.5<sup>o</sup> (after fourth pass production)
 +
* LHRS: &theta; = 44.5<sup>o</sup> (after third pass production)
 +
* RHRS: &theta; = 48.75<sup>o</sup> (after third pass DVCS elastic calibration)

Latest revision as of 15:24, 10 October 2016

During each pass change, we require a spectrometer pointing survey for the Left HRS and sometimes for the Right HRS.

  • LHRS: θ = 42.0o (after first pass optics)
  • RHRS: θ = 48.75o (after first pass optics)
  • LHRS: θ = 30.9o (after fourth pass production)
  • RHRS: θ = 55.5o (after fourth pass production)
  • LHRS: θ = 44.5o (after third pass production)
  • RHRS: θ = 48.75o (after third pass DVCS elastic calibration)