Line 1: Line 1:
Assume:
+
For the 12 GeV DVCS experiment, go to [[https://hallaweb.jlab.org/wiki/index.php/DVCS3 DVCS3 wiki ]]. <br>
-longitudinally polarized beam
+
-max 20 uA but for short times when it can go higher
+
-7.7 GeV-4 pass or  beam
+
  
  
== Commissioning/ Calibration ==
+
For the Fall of 2016 (FY2017), we plan on taking the kinematics 36_2, 36_3 and as many of the  60_* ones as we can.
=== Beam instruments ===
+
==== BCM ====
+
==== BPMs====
+
==== Moeller ====
+
The proposal goal calls for &Delta;P/P=1%
+
  
==== Compton ====
 
  
=== Luminosity ===
+
[[Image:Fall2016.jpg | 1200px]]
====Target Boiling ====
+
====Deadtime check ====
+
  
=== HRS ===
+
[[Fall 2016 optic plans]]
===Measure efficiencies  S2m, Cerenkov and wire chamber ===
+
  
=== Calorimeter ===
+
[[Fall 2016 calorimeter calibration (elastic)]]
==== DC readings ====
+
=== Elastic Calibration ===
+
  
==Main DVCS kinematics==
+
<hr>
 
+
<hr>
==12 GeV Era Run Schedule ==
+
<hr>
more of that
+
<hr>
 
+
==12 GeV Era Run Schedule ==
+
and even more
+

Latest revision as of 16:58, 2 November 2016

For the 12 GeV DVCS experiment, go to [DVCS3 wiki ].


For the Fall of 2016 (FY2017), we plan on taking the kinematics 36_2, 36_3 and as many of the 60_* ones as we can.


Fall2016.jpg

Fall 2016 optic plans

Fall 2016 calorimeter calibration (elastic)