Difference between revisions of "SoLID Weekly : Monday, Feb.6, 2017 9:30am EDT"
From Hall A Wiki
(→Minutes) |
(→Minutes) |
||
Line 10: | Line 10: | ||
*The dimensions of the designed sub-detectors need to be finalized in the Collaboration meeting on March 5-6 | *The dimensions of the designed sub-detectors need to be finalized in the Collaboration meeting on March 5-6 | ||
** The regular Monday meeting in two weeks from now will discuss the starting point of increasing space of sub-detectors (few cm--20cm--44cm?) | ** The regular Monday meeting in two weeks from now will discuss the starting point of increasing space of sub-detectors (few cm--20cm--44cm?) | ||
− | ** The target position is fixed and baffle | + | ** The target position is fixed and the baffle system is not changed. |
Revision as of 12:11, 6 February 2017
Agenda
Present:
Paul, JP, Seamus, Ole, Chao, Ye, Zhihong, Zhiwen, Nilange
Minutes
- Summarized the review text in 5 pages plus appendix
- Paul and JP will send Zhiwen their drafts
- The dimensions of the designed sub-detectors need to be finalized in the Collaboration meeting on March 5-6
- The regular Monday meeting in two weeks from now will discuss the starting point of increasing space of sub-detectors (few cm--20cm--44cm?)
- The target position is fixed and the baffle system is not changed.