Difference between revisions of "SoLID Weekly : Monday, Feb.6, 2017 9:30am EDT"

From Hall A Wiki
Jump to: navigation, search
(Minutes)
(Minutes)
Line 10: Line 10:
 
*The dimensions of the designed sub-detectors need to be finalized in the Collaboration meeting on March 5-6
 
*The dimensions of the designed sub-detectors need to be finalized in the Collaboration meeting on March 5-6
 
** The regular Monday meeting in two weeks from now will discuss the starting point of increasing space of sub-detectors (few cm--20cm--44cm?)
 
** The regular Monday meeting in two weeks from now will discuss the starting point of increasing space of sub-detectors (few cm--20cm--44cm?)
** The target position is fixed and baffle will not be changed.
+
** The target position is fixed and the baffle system is not changed.

Revision as of 12:11, 6 February 2017

Agenda

Present:
Paul, JP, Seamus, Ole, Chao, Ye, Zhihong, Zhiwen, Nilange

Minutes

  • Summarized the review text in 5 pages plus appendix
    • Paul and JP will send Zhiwen their drafts
  • The dimensions of the designed sub-detectors need to be finalized in the Collaboration meeting on March 5-6
    • The regular Monday meeting in two weeks from now will discuss the starting point of increasing space of sub-detectors (few cm--20cm--44cm?)
    • The target position is fixed and the baffle system is not changed.