Difference between revisions of "Thursday, February 23, 2017, 3:00 pm EST - Compton Electron Detector"

From Hall A Wiki
Jump to: navigation, search
 
(One intermediate revision by the same user not shown)
Line 15: Line 15:
  
 
=== General ===
 
=== General ===
* Argon experiment run ongoing- not enough time before start of run to remove electron detector
+
* Argon experiment run ongoing- not enough time before start of run to remove electron detector, so it's still in hall.
  
 
=== Laser ===
 
=== Laser ===
Line 23: Line 23:
 
=== Electron detector ===
 
=== Electron detector ===
 
* Plans for bench tests in EEL
 
* Plans for bench tests in EEL
** Do we need different DAQ, or is what is there already adequate  
+
** Do we need different DAQ, or is what is there already adequate?
 
** Need to obtain source?
 
** Need to obtain source?
 
** Need to write a somewhat detailed plan: how do we define "good enough"?
 
** Need to write a somewhat detailed plan: how do we define "good enough"?

Latest revision as of 12:11, 21 February 2017

*********BLUEJEANS CALL-IN INSTRUCTIONS*********
----------------------------------------------------
1. Dial Toll-Free Number: 1-888-240-2560 (U.S. & Canada)
2. International participants dial:
Toll Number: 1-408-740-7256
3. Enter meeting ID:140287970

Desktop sharing:
https://bluejeans.com/140287970 

Agenda

Meeting room=F228 in Cebaf Center

General

  • Argon experiment run ongoing- not enough time before start of run to remove electron detector, so it's still in hall.

Laser

  • Steering mirror issue fixed - new encoder
  • Will work on laser this summer as time allows

Electron detector

  • Plans for bench tests in EEL
    • Do we need different DAQ, or is what is there already adequate?
    • Need to obtain source?
    • Need to write a somewhat detailed plan: how do we define "good enough"?
  • QWAD tests in Manitoba
    • Signal from detector visible?
  • HVMAPS

Minutes