Difference between revisions of "SBS 2017 GMn Experimental Readiness Review"

From Hall A Wiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 21: Line 21:
 
|x:xx  ||        '''Charge Item 1,5,5c''':  Overview, general requirements, efficiency calibration                    ||        Brian Quinn (20+20)               
 
|x:xx  ||        '''Charge Item 1,5,5c''':  Overview, general requirements, efficiency calibration                    ||        Brian Quinn (20+20)               
 
|-
 
|-
|x:xx  ||    '''Charge Item 1,5''':  Apparatus ownership, maintenance and control;<br> Equipment to achieve the scientific goals; Safety Docs  ||      Mark Jones (20+20)       
+
|x:xx  ||    '''Charge Item 1,5''':  Apparatus ownership, maintenance and control;<br> Equipment to achieve the scientific goals; Safety Docs ([http://hallaweb.jlab.org/12GeV/SuperBigBite/documents/ERR2017/GMN-ERR-M-Jones.pdf pdf])   ||      Mark Jones (20+20)       
 
   |-
 
   |-
 
|x:xx  ||    '''Charge Item 2,3''': Beamline, supports,SBS and BigBite magnets, major engineering hardware    ||      Robin Wines (30+30)  
 
|x:xx  ||    '''Charge Item 2,3''': Beamline, supports,SBS and BigBite magnets, major engineering hardware    ||      Robin Wines (30+30)  

Revision as of 10:50, 3 May 2017

Overview

Super Bigbite

Experimental Readiness Review 2017

Time and Location

  • Date: 15-16 June 2017 (Thursday)
  • Location: TBA
  • ERR Committee TBA
  • ERR Charge (pdf)

Agenda

Morning
x:xx Closed Session ,
x:xx Remarks from Chair and Charge Chair
x:xx Charge Item 1,5,5c: Overview, general requirements, efficiency calibration Brian Quinn (20+20)
x:xx Charge Item 1,5: Apparatus ownership, maintenance and control;
Equipment to achieve the scientific goals; Safety Docs (pdf)
Mark Jones (20+20)
x:xx Charge Item 2,3: Beamline, supports,SBS and BigBite magnets, major engineering hardware Robin Wines (30+30)
12:00 Working Lunch
Afternoon
x:xx Charge Item 2,3: HCal Gregg Franklin (15+15)
x:xx Charge Item 2,3: Bigbite non-GEMs Todd Averett (20+20)
x:xx Charge Item 2,3: GEMs (pdf) Liyanage or Gnanvo (20+20)
x:xx Charge Item 2,3: CDet (pdf) Peter Monaghan (20+20)
x:xx Charge Item 2: Installation Jessie Butler (20+20)
x:xx Charge Item 4: Target, scattering chamber, and radiator Keith or Meekins (15+15)
x:xx Charge Item 3,5a: Software; GEM reconstruction efficiency at high rate (txt) Seamus Riordan (30+30)
x:xx Charge Item 5b: High trigger rate capabilities. What are the expected accidentals? (pdf pptx) Alexandre Camsonne (15+15)
x:xx Charge Item 6,7: fringe field effects; Beam commissioning / machine protection Yves Roblin (15+15)
x:xx Charge Item 8: radiation levels, local shielding; RSAD (pdf) Andrew Puckett (20+20)
Draft of COO (APEX's pdf)
Draft of ERG (APEX's pdf)
Draft of ESAD (APEX's pdf)
Input for RSAD from Radcon (radiation budget form) (APEX's pdf)
x:xx Closed Session
17:00 Close Out