Difference between revisions of "Target Operator Check List"
From Hall A Wiki
(New page: Target Operator Should Finish This check list for every shift. == Every Half Hour == * Pumping Laser Absorption Spectrum * No Error in Spin Flip Control Status Window * 5 Heart Beats are ...) |
(→After Call for a Bean on Request to MCC) |
||
Line 17: | Line 17: | ||
* Screen Shot Cell Temperature Reading | * Screen Shot Cell Temperature Reading | ||
− | == After Call for | + | == After Call for Beam to MCC == |
* Check Raster Size | * Check Raster Size | ||
* Check Beam Current | * Check Beam Current | ||
+ | * Check Trigger Rate |
Revision as of 16:42, 3 November 2008
Target Operator Should Finish This check list for every shift.
Every Half Hour
- Pumping Laser Absorption Spectrum
- No Error in Spin Flip Control Status Window
- 5 Heart Beats are on for Spin Flip Main Window
Every 2 Hour
- Check polarization drift
- Check Cell Temperature
- Check Oven Temperature
Every Shift
- Generate a Report from Spin Flip Main Window
- Screen Shot Pumping Laser Absorption Spectrum
- Screen Shot Laser Control Window
- Screen Shot Cell Temperature Reading
After Call for Beam to MCC
- Check Raster Size
- Check Beam Current
- Check Trigger Rate