Difference between revisions of "Wednesday October 4, 2017 2:00pm ET"

From Hall A Wiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 7: Line 7:
  
 
* Task list/status
 
* Task list/status
** tolerance analysis
+
** tolerance analysis (in progress)
** material irradiation
+
** material irradiation (new studies not begun)
** radiation loads
+
** radiation loads (new studies not begun)
** impact of environmental variations
+
** impact of environmental variations (???)
**  
+
** floor loading (???)
**  
+
** fringe field impact (maps created, sims not run)
**
+
 
* Status of MIT/JLAB work  
 
* Status of MIT/JLAB work  
 
** funding for new work
 
** funding for new work

Revision as of 13:44, 4 October 2017

Last meeting: Wednesday May 24, 2017 2:00pm ET


Agenda



  • Task list/status
    • tolerance analysis (in progress)
    • material irradiation (new studies not begun)
    • radiation loads (new studies not begun)
    • impact of environmental variations (???)
    • floor loading (???)
    • fringe field impact (maps created, sims not run)
  • Status of MIT/JLAB work
    • funding for new work
    • MIT/SBU spectrometer prototype fabrication status
      • a bulleted list of the objectives of prototype testing
      • a test plan and schedule for the above (so JLab folks should travel to observe some of the testing when appropriate)
    • a breakdown of the MIT request
      • coil tests
      • collimator/apparatus engineering
      • other activities
  • Next meeting



Minutes