Difference between revisions of "Wednesday October 4, 2017 2:00pm ET"

From Hall A Wiki
Jump to: navigation, search
(Agenda)
(Minutes)
Line 36: Line 36:
 
== Minutes ==
 
== Minutes ==
  
* Task list/status
+
* Task list/status  
 
** tolerance analysis (in progress)
 
** tolerance analysis (in progress)
 
** material irradiation (new studies not begun)
 
** material irradiation (new studies not begun)
Line 43: Line 43:
 
** floor loading (???)
 
** floor loading (???)
 
** fringe field impact (maps created, sims not run)
 
** fringe field impact (maps created, sims not run)
 +
** EB meeting this week
 +
** Collaboration meeting mid-month
 
* Status of MIT/JLAB work  
 
* Status of MIT/JLAB work  
** funding for new work
+
** funding for new work - request is in; they are considering it
 
** MIT/SBU spectrometer prototype fabrication status
 
** MIT/SBU spectrometer prototype fabrication status
 
*** a bulleted list of the objectives of prototype testing
 
*** a bulleted list of the objectives of prototype testing
 
*** a test plan and schedule for the above (so JLab folks should travel to observe some of the testing when appropriate)
 
*** a test plan and schedule for the above (so JLab folks should travel to observe some of the testing when appropriate)
 +
*** Ernie should continue to be the point man with Everson-Tesla
 
** a breakdown of the MIT request  
 
** a breakdown of the MIT request  
 
*** coil tests
 
*** coil tests

Revision as of 14:10, 4 October 2017

Last meeting: Wednesday May 24, 2017 2:00pm ET


Agenda



  • Task list/status
    • tolerance analysis
    • material irradiation
    • radiation loads
    • impact of environmental variations
    • floor loading
    • fringe field impact
  • Status of MIT/JLAB work
    • funding for new work
    • MIT/SBU spectrometer prototype fabrication status
      • a bulleted list of the objectives of prototype testing
      • a test plan and schedule for the above (so JLab folks should travel to observe some of the testing when appropriate)
    • a breakdown of the MIT request
      • coil tests
      • collimator/apparatus engineering
      • other activities
  • Next meeting



KK: wants to go over my understanding of what information JLab wants from the MIT/SBU spectrometer prototype and other efforts, in the hopes that we will get some additional money for fiscal 18 for design work:

  • a bulleted list of the objectives and what would be accomplished in the prototype testing once it has been delivered to SBU.
  • a test plan and schedule for the above (note that Thia has instructed Robin that some JLab folks should travel to observe some of the testing when appropriate).
  • a breakdown of the MIT request into what corresponds to the coil tests, and what corresponds to collimator/apparatus engineering and other activities.

We should figure out which of these can be done quickly and which of these requires work to be done and when it could be finished.

Minutes

  • Task list/status
    • tolerance analysis (in progress)
    • material irradiation (new studies not begun)
    • radiation loads (new studies not begun)
    • impact of environmental variations (???)
    • floor loading (???)
    • fringe field impact (maps created, sims not run)
    • EB meeting this week
    • Collaboration meeting mid-month
  • Status of MIT/JLAB work
    • funding for new work - request is in; they are considering it
    • MIT/SBU spectrometer prototype fabrication status
      • a bulleted list of the objectives of prototype testing
      • a test plan and schedule for the above (so JLab folks should travel to observe some of the testing when appropriate)
      • Ernie should continue to be the point man with Everson-Tesla
    • a breakdown of the MIT request
      • coil tests
      • collimator/apparatus engineering
      • other activities
  • Next meeting