Difference between revisions of "Wednesday October 4, 2017 2:00pm ET"

From Hall A Wiki
Jump to: navigation, search
(Minutes)
 
(6 intermediate revisions by 2 users not shown)
Line 7: Line 7:
  
 
* Task list/status
 
* Task list/status
** tolerance analysis (in progress)
+
** tolerance analysis
** material irradiation (new studies not begun)
+
** material irradiation
** radiation loads (new studies not begun)
+
** radiation loads
** impact of environmental variations (???)
+
** impact of environmental variations
** floor loading (???)
+
** floor loading
** fringe field impact (maps created, sims not run)
+
** fringe field impact
 
* Status of MIT/JLAB work  
 
* Status of MIT/JLAB work  
 
** funding for new work
 
** funding for new work
Line 28: Line 28:
 
== Minutes ==
 
== Minutes ==
  
* Task list/status
+
* Task list/status  
** tolerance analysis (in progress)
+
** tolerance analysis (in progress at Manitoba)
** material irradiation (new studies not begun)
+
** material irradiation (Rakitha will provide info to Juliette and MIT)
** radiation loads (new studies not begun)
+
** radiation loads (Rakitha will provide info to Juliette and MIT)
** impact of environmental variations (???)
+
** impact of environmental variations (Juliette will initiate conversation)
** floor loading (???)
+
** floor loading (MIT should approach JLAB about doing this estimate)
** fringe field impact (maps created, sims not run)
+
** fringe field impact (fully at Manitoba)
 +
** EB meeting this week
 +
** Collaboration meeting mid-month
 
* Status of MIT/JLAB work  
 
* Status of MIT/JLAB work  
** funding for new work
+
** funding for new work - request is in; they are considering it
 
** MIT/SBU spectrometer prototype fabrication status
 
** MIT/SBU spectrometer prototype fabrication status
 +
*** conductor arrived; tooling arrives within the week.  Waiting for another drive.
 +
*** beginning of December may be good for a visit for Juliette
 
*** a bulleted list of the objectives of prototype testing
 
*** a bulleted list of the objectives of prototype testing
 
*** a test plan and schedule for the above (so JLab folks should travel to observe some of the testing when appropriate)
 
*** a test plan and schedule for the above (so JLab folks should travel to observe some of the testing when appropriate)
 +
*** Ernie should continue to be the point man with Everson-Tesla
 
** a breakdown of the MIT request  
 
** a breakdown of the MIT request  
 
*** coil tests
 
*** coil tests
 
*** collimator/apparatus engineering
 
*** collimator/apparatus engineering
 
*** other activities
 
*** other activities
* Next meeting
+
* other tasks
 +
** Cameron working on shielding stuff
 +
** how to move forward with collimation over next couple of months
 +
*** inner photon collimator alignment
 +
**  send Cameron the CAD drawings
 +
 
 +
* Next meeting in two weeks; maybe a new time
  
 
<br><br>
 
<br><br>

Latest revision as of 14:26, 4 October 2017

Last meeting: Wednesday May 24, 2017 2:00pm ET


Agenda



  • Task list/status
    • tolerance analysis
    • material irradiation
    • radiation loads
    • impact of environmental variations
    • floor loading
    • fringe field impact
  • Status of MIT/JLAB work
    • funding for new work
    • MIT/SBU spectrometer prototype fabrication status
      • a bulleted list of the objectives of prototype testing
      • a test plan and schedule for the above (so JLab folks should travel to observe some of the testing when appropriate)
    • a breakdown of the MIT request
      • coil tests
      • collimator/apparatus engineering
      • other activities
  • Next meeting



Minutes

  • Task list/status
    • tolerance analysis (in progress at Manitoba)
    • material irradiation (Rakitha will provide info to Juliette and MIT)
    • radiation loads (Rakitha will provide info to Juliette and MIT)
    • impact of environmental variations (Juliette will initiate conversation)
    • floor loading (MIT should approach JLAB about doing this estimate)
    • fringe field impact (fully at Manitoba)
    • EB meeting this week
    • Collaboration meeting mid-month
  • Status of MIT/JLAB work
    • funding for new work - request is in; they are considering it
    • MIT/SBU spectrometer prototype fabrication status
      • conductor arrived; tooling arrives within the week. Waiting for another drive.
      • beginning of December may be good for a visit for Juliette
      • a bulleted list of the objectives of prototype testing
      • a test plan and schedule for the above (so JLab folks should travel to observe some of the testing when appropriate)
      • Ernie should continue to be the point man with Everson-Tesla
    • a breakdown of the MIT request
      • coil tests
      • collimator/apparatus engineering
      • other activities
  • other tasks
    • Cameron working on shielding stuff
    • how to move forward with collimation over next couple of months
      • inner photon collimator alignment
    • send Cameron the CAD drawings
  • Next meeting in two weeks; maybe a new time