KK: wants to go over my understanding of what information JLab wants from the MIT/SBU spectrometer prototype and other efforts, in the hopes that we will get some additional money for fiscal 18 for design work:
 
 
* a bulleted list of the objectives and what would be accomplished in the prototype testing once it has been delivered to SBU.
 
* a test plan and schedule for the above (note that Thia has instructed Robin that some JLab folks should travel to observe some of the testing when appropriate).
 
* a breakdown of the MIT request into what corresponds to the coil tests, and what corresponds to collimator/apparatus engineering and other activities.
 
 
We should figure out which of these can be done quickly and which of these requires work to be done and when it could be finished.
 
  
 
== Minutes ==
 
== Minutes ==
  
 
* Task list/status  
 
* Task list/status  
** tolerance analysis (in progress)
+
** tolerance analysis (in progress at Manitoba)
** material irradiation (new studies not begun)
+
** material irradiation (Rakitha will provide info to Juliette and MIT)
** radiation loads (new studies not begun)
+
** radiation loads (Rakitha will provide info to Juliette and MIT)
** impact of environmental variations (???)
+
** impact of environmental variations (Juliette will initiate conversation)
** floor loading (???)
+
** floor loading (MIT should approach JLAB about doing this estimate)
** fringe field impact (maps created, sims not run)
+
** fringe field impact (fully at Manitoba)
 
** EB meeting this week
 
** EB meeting this week
 
** Collaboration meeting mid-month
 
** Collaboration meeting mid-month
Line 48: Line 40:
 
** funding for new work - request is in; they are considering it
 
** funding for new work - request is in; they are considering it
 
** MIT/SBU spectrometer prototype fabrication status
 
** MIT/SBU spectrometer prototype fabrication status
 +
*** conductor arrived; tooling arrives within the week.  Waiting for another drive.
 +
*** beginning of December may be good for a visit for Juliette
 
*** a bulleted list of the objectives of prototype testing
 
*** a bulleted list of the objectives of prototype testing
 
*** a test plan and schedule for the above (so JLab folks should travel to observe some of the testing when appropriate)
 
*** a test plan and schedule for the above (so JLab folks should travel to observe some of the testing when appropriate)
Line 55: Line 49:
 
*** collimator/apparatus engineering
 
*** collimator/apparatus engineering
 
*** other activities
 
*** other activities
* Next meeting
+
* other tasks
 +
** Cameron working on shielding stuff
 +
** how to move forward with collimation over next couple of months
 +
*** inner photon collimator alignment
 +
**  send Cameron the CAD drawings
 +
 
 +
* Next meeting in two weeks; maybe a new time
  
 
<br><br>
 
<br><br>

Latest revision as of 14:26, 4 October 2017

Last meeting: Wednesday May 24, 2017 2:00pm ET


Agenda



  • Task list/status
    • tolerance analysis
    • material irradiation
    • radiation loads
    • impact of environmental variations
    • floor loading
    • fringe field impact
  • Status of MIT/JLAB work
    • funding for new work
    • MIT/SBU spectrometer prototype fabrication status
      • a bulleted list of the objectives of prototype testing
      • a test plan and schedule for the above (so JLab folks should travel to observe some of the testing when appropriate)
    • a breakdown of the MIT request
      • coil tests
      • collimator/apparatus engineering
      • other activities
  • Next meeting



Minutes

  • Task list/status
    • tolerance analysis (in progress at Manitoba)
    • material irradiation (Rakitha will provide info to Juliette and MIT)
    • radiation loads (Rakitha will provide info to Juliette and MIT)
    • impact of environmental variations (Juliette will initiate conversation)
    • floor loading (MIT should approach JLAB about doing this estimate)
    • fringe field impact (fully at Manitoba)
    • EB meeting this week
    • Collaboration meeting mid-month
  • Status of MIT/JLAB work
    • funding for new work - request is in; they are considering it
    • MIT/SBU spectrometer prototype fabrication status
      • conductor arrived; tooling arrives within the week. Waiting for another drive.
      • beginning of December may be good for a visit for Juliette
      • a bulleted list of the objectives of prototype testing
      • a test plan and schedule for the above (so JLab folks should travel to observe some of the testing when appropriate)
      • Ernie should continue to be the point man with Everson-Tesla
    • a breakdown of the MIT request
      • coil tests
      • collimator/apparatus engineering
      • other activities
  • other tasks
    • Cameron working on shielding stuff
    • how to move forward with collimation over next couple of months
      • inner photon collimator alignment
    • send Cameron the CAD drawings
  • Next meeting in two weeks; maybe a new time