Difference between revisions of "Thursday, November 2, 2017 4PM ET"
From Hall A Wiki
(New page: Previous meeting: Thursday, October 19, 2017 4PM ET Media:KK's MOLLER Task List.pdf <Big>Tasks for Simulation group to track:</Big> :1) Wouter -- Pion Simulation (Muon Pair Prod...) |
|||
Line 37: | Line 37: | ||
==Agenda== | ==Agenda== | ||
− | 1) Discuss phase change in meeting schedule. Our next | + | 1) Discuss phase change in meeting schedule. Our next meeting could be Nov 9 (maybe too soon after Director Review Task Meeting) or December 7 (note that Nov 23 is Thanksgiving) |
+ | |||
+ | 2) Director's Review task tracking updates | ||
Revision as of 10:38, 31 October 2017
Previous meeting: Thursday, October 19, 2017 4PM ET
Media:KK's MOLLER Task List.pdf
Tasks for Simulation group to track:
- 1) Wouter -- Pion Simulation (Muon Pair Production): could be significant for pion detector
- 2) Pion and Simulation Group -- Simulation/Pion (Hyperon background estimation): Strategy to evaluate the hyperon bkgd using full suite of detectors
- 3) Seamus and Yury -- General/Simulation (Radiative corrections for all physics processes): Incorporate radiative corrections for e-e and inelastic e-p scattering
- 4) David and Seamus -- Simulation/Tracking (Optics collimator for Q2): simulated Q2 analysis and the use of tracking GEMs and special collimation
- 5) LA Tech and SBU -- Simulation/Shielding and Activation : Optimizing the shielding design and develop first order practical design that can be passed to engineers, Radiation load on target clam-shell (o-ring) and magnet coils, Activation studies for various components.
- 6) TBD -- Detectors/Simulation (Slit scattering bkgd): Comprehensive note summarizing the elimination of all 1-bounce and leading 2-bounce sources
Tasks which overlap with Integrating Detector Subgroup:
- 7) Pion Group -- Pion Simulation (Beamdump bkgd impact): beamdump bkgds may affect some detectors
- 8) Manitoba and SBU -- Detectors/Simulation (PMT backgrounds): Comprehensive estimate of all bkgds at the main detector PMTs
- 9) UVA Group -- Detector/Simulation (Main detector geometries): Optimize radial and azimuthal ring dimensions to optimize background asymmetry correction determination and systematic (Yuxiang's approach)
- 10) UVA Group -- Simulation (PMT double difference): From Qweak experience, evaluate upper limit to possible systematic from A_T in showerMax and thin quartz
- 11) SBU Group Detectors/Simulation (ShowerMax splashback): Estimate possible bkgds in main detector PMTs from shmx splashback
- 12) SBU Group -- Detectors/Simulation (Detector shielding optimization): Figure out the configuration of heavy- and light-Z shielding (First need shielding Geometry)
- 13) SBU Group -- Detectors/Simulation (Crosstalk evaluation): Evaluate impact on specific detector measurements of bkgd from other sources
Agenda
1) Discuss phase change in meeting schedule. Our next meeting could be Nov 9 (maybe too soon after Director Review Task Meeting) or December 7 (note that Nov 23 is Thanksgiving)
2) Director's Review task tracking updates
put your slides or links to elogs here
Attendance:
Minutes:
Return to Teleconferences
Return to MOLLER at 11 GeV E09-005