== Minutes ==
 
== Minutes ==
  
Attended:  
+
Attended: Juliette, Seamus, Cameron, Jim, Ernie, KK
 
+
  
 +
* Preparation for MOLLER tracking meeting - status
 +
** Need to go back to reviewers and ask what they meant, if we need to
 +
** Radiation dose estimates/material irradiation [https://hallaweb.jlab.org/wiki/images/1/18/Coil_scan_summary.pdf  summary]
 +
** Upstream sensitivity studies [https://hallaweb.jlab.org/wiki/images/c/c4/Spectrometer_update_11-1-2017.pdf summary]
 +
** Beamline fringe field effects
 +
** MIT activities
 +
*** impact of environmental variations
 +
**** expanding and contracting uniformly (that's how water system is being designed)
 +
**** heat load on hot day - just run hotter
 +
**** we need to cool our water anyway - our refrigerator design
 +
*** floor loading - probably not a concern (each component less than what crane can list)
 +
* Test coil status/homework
 +
** Objectives
 +
** Test plan
 +
** Schedule
 +
* Next meeting
  
 
<br><br>
 
<br><br>

Revision as of 15:15, 1 November 2017

Last meeting: Wednesday October 18, 2017 2:00pm ET


Agenda



  • Preparation for MOLLER tracking meeting - status
    • Radiation dose estimates/material irradiation summary
    • Upstream sensitivity studies summary
    • Beamline fringe field effects
    • MIT activities
      • impact of environmental variations
      • floor loading
  • Test coil status/homework
    • Objectives
    • Test plan
    • Schedule
  • Next meeting



Minutes

Attended: Juliette, Seamus, Cameron, Jim, Ernie, KK

  • Preparation for MOLLER tracking meeting - status
    • Need to go back to reviewers and ask what they meant, if we need to
    • Radiation dose estimates/material irradiation summary
    • Upstream sensitivity studies summary
    • Beamline fringe field effects
    • MIT activities
      • impact of environmental variations
        • expanding and contracting uniformly (that's how water system is being designed)
        • heat load on hot day - just run hotter
        • we need to cool our water anyway - our refrigerator design
      • floor loading - probably not a concern (each component less than what crane can list)
  • Test coil status/homework
    • Objectives
    • Test plan
    • Schedule
  • Next meeting