Line 15: | Line 15: | ||
* Checkout with cosmics | * Checkout with cosmics | ||
− | =Scifi= | + | =Scifi and Sieve Slit= |
* Present state tested and operational? | * Present state tested and operational? | ||
* Cabling and patch panels ready | * Cabling and patch panels ready | ||
Line 23: | Line 23: | ||
** Integration with existing HV system | ** Integration with existing HV system | ||
** Stepper motor | ** Stepper motor | ||
+ | * Sieve needs to be installed into HRS | ||
=Software= | =Software= | ||
Line 39: | Line 40: | ||
=Raster= | =Raster= | ||
*Analysis with new FADC readout (has been done for prior experiments) | *Analysis with new FADC readout (has been done for prior experiments) | ||
+ | |||
+ | =Survey= | ||
+ | *HRS | ||
+ | *Septum | ||
+ | *Sieve | ||
+ | *Target |
Latest revision as of 13:36, 18 June 2018
Contents
Planning and Documentation
- Comissioning and Calibration Plans
- Septum current selection
- Shift beam checkout procedures with target
- Optics
- Shift page
- Authorship and shift requirements
Target
- Establishing parallel beam optics (Yves Roblin)
- OSP (Silviu)
DAQ
- Establishing coincident timing alignment for trigger (scintillator and Cerenkov)
- Checkout with cosmics
Scifi and Sieve Slit
- Present state tested and operational?
- Cabling and patch panels ready
- Commissioning plans
- Development of online, offline analysis software
- Slow controls
- Integration with existing HV system
- Stepper motor
- Sieve needs to be installed into HRS
Software
- Reestablish online scripts and replay libraries
- Integrate new scifi
- Procedures written for shift crew
Septum
- Identify power supply and integrate to slow controls
- Corrector magnet construction (Hall A engineering)
VDC
- HV adjustments for drain currents
- Resistor modification
Raster
- Analysis with new FADC readout (has been done for prior experiments)
Survey
- HRS
- Septum
- Sieve
- Target