Difference between revisions of "APEX Run Preparation List"

From Hall A Wiki
Jump to: navigation, search
(Target)
 
Line 15: Line 15:
 
* Checkout with cosmics
 
* Checkout with cosmics
  
=Scifi=
+
=Scifi and Sieve Slit=
 
* Present state tested and operational?
 
* Present state tested and operational?
 
* Cabling and patch panels ready
 
* Cabling and patch panels ready
Line 23: Line 23:
 
** Integration with existing HV system
 
** Integration with existing HV system
 
** Stepper motor
 
** Stepper motor
 +
* Sieve needs to be installed into HRS
  
 
=Software=
 
=Software=
Line 39: Line 40:
 
=Raster=
 
=Raster=
 
*Analysis with new FADC readout (has been done for prior experiments)
 
*Analysis with new FADC readout (has been done for prior experiments)
 +
 +
=Survey=
 +
*HRS
 +
*Septum
 +
*Sieve
 +
*Target

Latest revision as of 13:36, 18 June 2018

Planning and Documentation

  • Comissioning and Calibration Plans
    • Septum current selection
    • Shift beam checkout procedures with target
    • Optics
  • Shift page
  • Authorship and shift requirements

Target

  • Establishing parallel beam optics (Yves Roblin)
  • OSP (Silviu)

DAQ

  • Establishing coincident timing alignment for trigger (scintillator and Cerenkov)
  • Checkout with cosmics

Scifi and Sieve Slit

  • Present state tested and operational?
  • Cabling and patch panels ready
  • Commissioning plans
  • Development of online, offline analysis software
  • Slow controls
    • Integration with existing HV system
    • Stepper motor
  • Sieve needs to be installed into HRS

Software

  • Reestablish online scripts and replay libraries
    • Integrate new scifi
  • Procedures written for shift crew

Septum

  • Identify power supply and integrate to slow controls
  • Corrector magnet construction (Hall A engineering)

VDC

  • HV adjustments for drain currents
  • Resistor modification

Raster

  • Analysis with new FADC readout (has been done for prior experiments)

Survey

  • HRS
  • Septum
  • Sieve
  • Target